Warning signs when choosing a renovation contractor
A single sign condemns no one; two or three together at the visit, in the quote or in payment terms are a reason to stop and ask.
View detailsBCN YARD
Practical guides to house construction, turnkey renovation and interior design. Decisions, questions and examples for your project in Barcelona and the wider province.

A single sign condemns no one; two or three together at the visit, in the quote or in payment terms are a reason to stop and ask.
View details
A verbal quote fixes neither scope, materials, timing nor payment terms, and in a dispute nothing can be proved. Where expectations usually clash and how to get it onto paper.
View details
Paying without an invoice or receipt makes it harder to establish the agreed work and payments. Check legal cash limits and retain the contract, invoices and payment evidence.
View details
A few minutes with BORME, a nota simple and the insolvency register confirm that the company exists, who runs it and whether it is insolvent.
View details
Without liability insurance, damage to neighbours or shared areas during the works can end up on you. How to check the policy before signing.
View details
A contractor’s address is not decoration: it is where claims reach them if a defect appears after the works. How to check it in half an hour.
View details
A padel court at a villa needs about 10 by 20 metres inside the enclosure, 6 metres of clear height, a sloped base and approval from the ayuntamiento. Dimensions, noise, lighting and how a court differs from tennis.
View details
A private collection garage starts from the weight of the cars and the type of lift, not from the finish. Floor loading, surface, CTE ventilation, climate, fire measures and charging.
View details
How renovating a villa in Vinyet, Terramar and Can Girona differs from the old town: terrain, the coastal strip, the licence and logistics on narrow streets.
View details
Which authority issues the licence in Valldoreix and in Mirasol, how these areas differ for a renovation, and how to agree the work with the estate and neighbours.
View details
A house beside Collserola is renovated with an eye on the park plan, the fire strip and the slope. What to check before buying and pricing, and how to bring materials up narrow roads.
View details
Salt and wind hit the balcony, windows and hardware harder than the interior, where damp is the real problem. How Barceloneta and Port Olímpic differ and what the Coastal Law means.
View details
A Barcelona renovation passes through five levels: City Council, housing offices, Generalitat, state registers and professional bodies. Here is who does what and which guide to read next.
View details
Most offices and shops in Barcelona need an activity notice rather than a licence. You can file it yourself on the Oficina Virtual, though almost always with a technician's certificate.
View details
The Catastro and the Land Registry are separate records. The Catastro must be told within two months of completion unless someone does it for you; the Land Registry records an extension through a notarial deed.
View details
A lift in an old building needs three things: a simple-majority owners' vote, a City Council permit (works notice or licence depending on whether it goes inside or outside) and a commissioning declaration to the Generalitat.
View details
Barcelona owners' associations have two Consorci de l'Habitatge lines: energy refurbishment of the building and accessibility, lifts included. Requirements, amounts, documents and what is open in 2026.
View details
Barcelona's Next Generation grant for individual flats closed on 30 June 2026. Two realistic routes remain: renovating for the Borsa d'Habitatge de Lloguer and the IRPF energy-efficiency deduction.
View details
What to check before touching a tree on a villa plot in Barcelona and its surroundings, and how to avoid losing the garden or money during construction.
View details
How to size a rainwater cistern for a villa with a large garden, where to bury it, which pump and filters to fit, and what to do when water restrictions apply.
View details
A luxury modular house in Catalonia is possible, but the factory does only part of the job: the plot, permit, foundations and connections stay as for a conventional house. Systems, timelines, market prices and sloping plots.
View details
A basement under a finished house is possible if the ground and the water level allow it: the foundations are underpinned in sections, to a design and with settlement monitoring. Method, water, neighbours, permit and what makes up the cost.
View details
Renovating an existing house in the coastal protection zone is allowed if volume, height and floor area do not grow and energy efficiency improves. Extending or rebuilding is not. Zones, procedure and typical mistakes.
View details
Where damp comes from in houses on the Gavà Mar coastal plain, how to read the geotechnical report and CTE DB-HS 1, what to do about pine roots and which rules apply by the sea.
View details
How to tell termites from woodworm, what to check in the beams and doors of an old house before buying and renovating, how to treat it, and who pays in a building with an owners' community.
View details
A glossary of forty terms found in a Spanish renovation quote, project and contract: who does what, what makes up the price, and which documents are needed before, during and after the works.
View details
A battery covers short outages silently and without a gap, a generator handles long outages and heavy loads, a UPS protects networks and controllers. What to connect, how to tie it to solar panels and what to register.
View details
In a community building a charger on your own garage space needs prior notice to the community; at a villa it comes down to supply capacity and the panel. Rules, ITC-BT-52 power levels, paperwork and what to pre-wire during a renovation.
View details
Barcelona's bylaw allows works from Monday to Friday; weekends and nights only with municipal authorisation. Building rules can be stricter. Hours, machinery, complaints and how to plan the noisy phases.
View details
Each town sorts works into minor and major in its own way, charges the ICIO tax and fees under its own bylaws and takes applications differently. What to check before filing and where people most often go wrong.
View details
What to gather before a showroom visit, which items to choose before work starts, what to ask about lead times, batches and price, and how to put your choice into a document.
View details
Architect fees in public sources range from 4 to 15 % of the budget because they measure different things. Payment models and when the law requires an architect.
View details
A specification of finishes turns a quote from a list of prices into a document you can check and compare. Which lines it needs and how to word the substitution rule.
View details
The three levels of design documentation and what you get at each: from the idea and layout to the sheets used to build and to fix a price. What the licence needs and what a firm quote needs.
View details
A guest suite and a staff room are planned around independence: their own access, bathroom, ventilation and sound insulation. We cover layout, laundry and comfort for a stay of a week or two.
View details
A home bar is planned as a separate zone next to the living room or terrace: water and drain, cooling, cigar ventilation and evening light are built in before the rough works.
View detailsTwo flats of the same size can differ by fifty per cent within the same finish level because of their starting condition and layout. A flat with 1970s services needs new wiring, water supply and waste pipes right up to the stack. Moving the kitchen or bathrooms requires new sloped waste runs, and touching the structure needs calculations, a project and a permit.
Read the full guideThe cédula de habitabilidad certifies that a home meets the minimum conditions for living in it, and in Catalonia it is required to sell or let the property and to connect utilities. It is not a building permit: the town hall permit covers the works, while the cédula confirms the finished home complies. There is a first-occupancy cédula and a second-occupancy one.
Read the full guideA very cheap renovation quote often leaves out waste removal and the skip, protection for the lift and entrance hall, floor levelling, reveals, concealed access panels, primers and the final clean. It also commonly omits permits and technical supervision, or does not say whether the price includes VAT.
Read the full guideBCN YARD's guide price for a full renovation, with materials, labour and site organisation included, starts at €1,000/m² excluding VAT at Premium level, €2,000/m² at Luxury and €3,000/m² at Signature. The balance between materials and labour varies by item, and the final quote is prepared after a site visit and measurements.
Read the full guideYes: design the whole flat at once and carry out the work in stages. The first stage then prepares what later ones will need, such as a consumer unit sized for the whole home, pipes to the future bathroom, routes for air conditioning and a single floor level. Start with services, partitions and screeds, and spread out the finishes.
Read the full guideWhen the kitchen is part of a full flat renovation, BCN YARD prices it within the overall level: from €1,000/m² excluding VAT for Premium, €2,000/m² for Luxury and €3,000/m² for Signature. If only the kitchen is being renovated, a separate quote is given after a site visit and measurements, because the price depends on what is hidden in the walls and what goes inside the cupboards.
Read the full guideBringing in another company straight away is the most expensive mistake: once it closes up walls or lays tiles, proving what was done and how becomes almost impossible. First photograph and film every room with dates and commission an expert report from an independent arquitecto técnico. For the strongest evidence, a notary can draw up an acta notarial de presencia.
Read the full guideNo. If the works have been stopped for days with no explanation, the first step is to stop paying and not sign any new documents the contractor offers. Then document the state of the home with dated photos, list what has been paid and what has actually been done, and send a written demand with a specific deadline to resume the works.
Read the full guideOur guide for the Signature level is from 3,000 €/m² excluding VAT, with the exact price given in the estimate after a visit and measurements. In a tower logistics adds to it: lift booking, hoisting large pieces, protecting common areas. Glazing and climate control are approved separately, and their cost depends on what the community decides.
Read the full guideOur guide for the Signature level is from 3,000 €/m² excluding VAT; the exact price is given in the estimate after a visit and measurements. On a slope it adds geotechnics, retaining walls, drainage, fire measures and difficult logistics on a narrow road. These items can only be seen by inspecting the plot.
Read the full guideAdapting is faster if finishes, lighting, paint and furniture change. If you need a new layout, it is faster and cheaper to renovate a flat meant for renovation than to break someone else's fresh work. A full renovation with a design and licence takes months; the exact duration comes from the contractor after a visit and measurements.
Read the full guidePartly. Fixed costs such as site set-up, the project and management are spread over more metres. But bathrooms, the kitchen, doors and wardrobes are counted by the item and do not get cheaper. There is no discount for size: the effect shows in the estimate as a smaller share of fixed costs.
Read the full guideThe doorman neither authorises nor forbids a renovation: he follows the building's rules and the administrator's instructions. If workers are not on the list he follows, he may refuse them entry. So before work starts give him the list of people, the schedule and the contact of the person in charge, agreed with the administrator.
Read the full guideYou can, but choose engineered boards or wood-look porcelain, and avoid wide-plank solid wood without humidity control: in damp air it behaves unpredictably. Boards are acclimatised in the flat before laying, and indoor humidity is held steady with ventilation and dehumidification, especially when you are away.
Read the full guideThere is no exact number; it depends on the size and complexity of the project. For a luxury-level flat it runs to hundreds of items, from layout and stone to handles and switches. That is why it is important to split them by stage and present a few a week rather than all at once at the start.
Read the full guideA carcass from 18 to 19 mm board with laser ABS edging, a moisture-proof plinth in aluminium or plastic, fully extending drawers with no play, and equal 2 to 3 mm gaps between fronts. Open the heaviest drawer when loaded: it should not pull the front down. Hardware from recognised makers, with the model named in the specification.
Read the full guideLook for everyday details: ventilation grilles, switches, signs of use, imperfect light. Ask for construction photos, before and after, dated working drawings and the owner's or contractor's contact. Renders are too clean and symmetrical, and technical elements are usually hidden.
Read the full guideConcept and layout, design scheme with views, working documentation (dimensioned plans, elevations, layouts, details, electrics, lighting, plumbing), procurement and design supervision. The contract should name deliverables and sheet counts for each stage. A bare "design project" with no list breeds disputes.
Read the full guideThe certificat d'habitabilitat attached to the cèdula application can only be signed by architects, technical architects (aparejadores) or building engineers. The technician visits the dwelling and checks floor areas, ceiling heights, natural light and ventilation, bathroom, kitchen and services under Decret 141/2012. The owner can file the application itself.
Read the full guideIt depends on the OMAIIAA regime. Most offices and shops fall under annex III and open with an activity notice, not a licence; annex II activities, such as many bars and restaurants with customers and noise, need a licence. The regime depends on the location, the activity category and its floor area, capacity and installations.
Read the full guideNot just like that. Barcelona's urban landscape bylaw (OUPU) prohibits placing technical equipment on the face of the façade, in enclosed balconies and on balcony railings. It only allows units and ducts on the façade with an integration project accepted by the municipal technical services through the relevant licence. The preferred place for the outdoor unit is almost always the roof.
Read the full guideNo. In Catalonia, work handling asbestos-containing materials may only be done by companies registered in the Registre d'Empreses amb Risc d'Amiant (RERA), with an approved work plan. The owner's part is to commission the survey, choose the company, obtain the building permit and apply for grants. Removing a fibre-cement sheet yourself is prohibited and dangerous.
Read the full guideA building's protection level in Barcelona can be checked free of charge on the Ajuntament's Portal d'Informació Urbanística (PIU): you type the address and get the plot record with the protection level, zoning and licence suspensions. No identification is needed. Listed plots appear on the map with brown dotted hatching and the level letter in the centre.
Read the full guideICIO in Barcelona is 4% of the material execution cost of the works, under tax ordinance 2.1 approved on 30 January 2026. The base excludes VAT, fees, technicians' fees, the contractor's profit and overheads. For example, a renovation with a material execution budget of 60,000 euros pays 2,400 euros in ICIO.
Read the full guideIn Barcelona, work on common elements is funded by the Consorci de l'Habitatge de Barcelona, with two lines for communities: «Ajuts a la rehabilitació de l'edifici», with Next Generation funds, for façade, roof, windows and services if energy consumption falls; and «Ajuts a la rehabilitació per a actuacions d'accessibilitat», for lifts, ramps and removing barriers. The community applies, usually through the administrator or president.
Read the full guideThe ORPIMO sets a maximum decision time for a major works licence of two months under the general procedure and three months when a mandatory fire brigade or heritage report is needed. The period only counts the Administration's time and stops while your documents are being corrected. If something is missing, you have ten days to complete it or the application is treated as withdrawn.
Read the full guideNo. The Consorci de l'Habitatge de Barcelona «Ajuts a la rehabilitació de l'habitatge» line, worth up to €6,000 for windows, insulation and climate control in your main home, accepted applications until 30 June 2026, with works finished by that date. In autumn 2026 two routes remain: renovating for the Borsa d'Habitatge de Lloguer and income tax (IRPF) deductions for energy efficiency.
Read the full guideThe electrical certificate, CIEBT in Catalonia, is issued and signed only by an authorised installation company, meaning one registered in the Catalan RASIC register. The owner cannot issue it even if they did the wiring. Before hiring, ask the installer for their RASIC number and category and check them in the register's public search on the Generalitat website.
Read the full guideNo: replacing windows facing the street or the inner courtyard almost never qualifies as an assabentat, because windows are part of the façade. Under ORPIMO, in an unprotected building it is obra menor tipus II, meaning a comunicat immediat. In protected buildings the procedure is stricter, up to a llicència d'obres majors.
Read the full guideAn extension, new build or renovation that changes a property's description must be declared to the Catastro within two months of the end of works. You can file it yourself on the Sede Electrónica del Catastro with a digital certificate or Cl@ve, at the Gerencia, at a Punto de Información Catastral or at the town hall. It is not needed if the notary, registrar or town hall has already sent the data.
Read the full guideFor works procedures, Barcelona City Council's Oficina Virtual accepts idCAT Mòbil, idCAT Mòbil+, Cl@ve with SMS codes, the electronic DNI, idCAT Certificat and other qualified digital certificates, such as the FNMT personal certificate. They are used to file a consulta prèvia, a comunicat or a licence application and to track the case.
Read the full guideThe energy efficiency certificate is mandatory in Catalonia for new buildings and for existing homes that are sold or let to a new tenant; for existing buildings the rule has applied since 1 June 2013. The label must appear in every offer, advert and listing. If you renovate your own home to live in, the law does not require one.
Read the full guideGas work in a flat or house in Catalonia may only be done by an empresa instal·ladora de gas habilitada registered in the Catalan RASIC registry. The installer carries out the work and the tightness test and issues the certificat d'instal·lació with operating instructions and a pipe-route diagram. The owner does not move pipes or appliances but keeps all the paperwork.
Read the full guideCosts usually outside the builder's quote include fees for the architect and technical architect, the health and safety coordinator, the topographic survey and geotechnical study, ICIO and the licence fee, water, power and sewer connections, notary and land registry fees for the new building, and LOE insurance. Which apply is confirmed with the Ajuntament and your gestor.
Read the full guideIt is best to build the pool before landscaping. Excavation needs access for machinery, reveals what lies underneath, such as rock, made ground or water, and leaves spoil to be removed. If the hole is dug next to a finished lawn and paths, putting them back comes out of the owner's budget.
Read the full guideA plant room needs the service clearance each manufacturer specifies, a route and a door wide enough to replace the equipment whole, a floor drain, a water point, dedicated sockets, proper lighting and ventilation so heat and moisture do not build up. Noisy equipment goes away from the bedrooms. All of it is settled before the walls go up.
Read the full guideAccording to the Habitissimo catalogue (updated 16 September 2026), 10,000 to €19,000, with an average of €14,000. That is for flat ground and a standard finish, without landscaping, heating or fencing. At a villa with a slope and stone the price is higher; the exact sum comes from the estimate after the survey and measuring the plot.
Read the full guideYes, often with a fine result: an infinity edge opens up the view. But a shell on a slope needs a retaining wall, drainage and a ground-load calculation. The pool goes on a terrace cut into the slope, not on fill, and that is included in the budget.
Read the full guideIt depends on land classification. On urban land the protection zone is 20 metres wide, so a house 100 metres away is outside it, though the development plan and the zone of influence still apply. On non-urban land, 100 metres is exactly the edge of the protection zone. The boundary line decides, so start with a surveyor's plan and the town hall's information.
Read the full guideA house's sound insulation is decided at design and structural stage: the mass of walls and floor slabs, floating floors, windows and where noisy services go. Final finishes only slightly improve what was done before. If quiet is a priority, say so at the first meeting, not when the paint is being chosen.
Read the full guideA new house's insulation depends on five decisions: the roof insulation, the façade system, insulation of the ground slab, how thermal bridges are broken and the airtightness with its ventilation. Windows and solar shading complete the picture. All of it is decided before the structure goes up.
Read the full guideA home can be extended by exactly what the planning rules allow for that plot, minus what is already built. What counts is the buildable floor area, plot coverage, height and number of storeys, and setbacks. Free land tells you nothing: two identical plots in different planning zones can have very different margins.
Read the full guideUsually yes: a licence or notice to the council, and felling catalogued trees is forbidden. The rules come from your ayuntamiento's ordinance; next to woodland the Generalitat's forest regime adds to it. Write to the green spaces department and wait for the reply before starting work.
Read the full guideInterior design for a new house starts alongside the outline design, not once the house already has partitions. In a house, the interior can affect façade openings, heights, floor levels and service routes. Every interior decision has a construction stage after which changing it means redoing finished work or giving up the idea.
Read the full guideModern gearless traction lifts and vacuum lifts are quiet, but in practice installation decides: isolating the shaft from bedroom walls, anti-vibration mounts, soft start. With a hydraulic lift it is mostly the pump you hear, and it goes in a separate room. Check the sound on a demonstration model.
Read the full guideBefore paying a deposit on a building plot, make five checks: planning status and building parameters, access and utility connections, slope and ground, encumbrances in the Land Registry and the full cost of preparing the plot. Skipping one can mean that the house you want cannot be built there, or that it will cost noticeably more.
Read the full guideNo frame material is best for house windows in every case. Thermally broken aluminium handles large sizes and slim frames with almost no upkeep. uPVC insulates well at a moderate price, but the frame becomes bulky on large sashes. Timber looks warm and insulates well, but on sunny façades its finish needs regular renewal.
Read the full guideIn Catalonia a small system is almost always fitted, but it runs seldom and at low power: shade, night ventilation and heat recovery hold the temperature. The standard limits hours above 25 °C to 10% of the year, and that is achieved by design, not by the capacity of the air conditioner.
Read the full guideRenovation quotes are compared line by line, not by the total: what is included, what is excluded and what is unclear. First give every contractor the same brief — plan, list of works and chosen materials — and ask for itemised quotes with quantities and unit prices. Every unclear item becomes a question, answered in writing.
Read the full guideStart with four topics: who does the work and who is on site every day, how the estimate is built and what it leaves out, how the schedule and phase sign-off are organised, and on what terms payment and warranty are arranged. A good answer is specific and backed by a document or an example. A bad one is vague and avoids numbers.
Read the full guideThe outdoor unit cannot go on the facade of a protected building, and on an ordinary one its placement is processed separately; if it goes on common areas, the owners’ association must agree. If the consumer unit or electrical line changes, the installer issues the electrical certificate, and the gas is decommissioned by an authorised installer.
Read the full guideSmooth, non-porous and washable: seamless vinyl turned up the wall, resin, porcelain with epoxy joints, HPL, glass, Corian. Timber and natural stone are kept for reception and consulting rooms. The final choice is agreed with the doctors and the authorising body.
Read the full guideCommission a written inspection from an independent specialist before signing the arras: beam ends in walls, doors and frames, parquet on battens, moisture in wood and walls, awl probing and selective opening-up. Put a withdrawal or price renegotiation condition in the contract if infestation is found. An inspection is no guarantee; keep a reserve for replacements.
Read the full guideA resilient layer in the neighbour's floor solves it best. In your flat a ceiling on resilient hangers with mineral wool and two layers of plasterboard helps. One ceiling rarely solves everything, because sound travels through walls, so the best result comes from the combination of ceiling, floating floor and wall linings.
Read the full guideTo refit commercial premises, a contractor needs to know how customers and staff move, what is stored, where the server or network cabinet, till, alarm and cameras go, and which equipment connects to power, water and extraction, and at what load. Brand elements and growth plans matter too, so wiring and networking can be sized for them from the start.
Read the full guideBCN YARD's reference on living area, excluding VAT: Luxury from 600,000 € and Signature from 900,000 €. Roof, facade, garden, pool and boundary wall are priced as separate chapters. With 21% VAT, Signature comes to from 1,089,000 €. The exact price comes from the estimate after the site visit and measurements, because every villa has its own structure and envelope.
Read the full guideWithin a full renovation, BCN YARD includes the bathroom in its price levels excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². A stand-alone bathroom is quoted item by item after a site visit and measurements, because the price depends on whether fittings move, what is behind the walls, and the chosen taps and finishes.
Read the full guideYes. In Catalonia the accessibility code of Decret 209/2023 applies. A step is resolved with a platform or ramp inside the unit so the facade does not change, and where that fails, alternative solutions are justified. This is agreed in advance.
Read the full guideEach trade's line items are lower, but the total often evens out. Idle time between trades, rework, retail prices on material, the safety coordinator and your own time all get added. The saving is real on a small job with one or two trades. On a full renovation of a flat or a house, the balance usually tips towards a single contractor.
Read the full guideTo find mistakes in one room rather than fifty. The prototype shows light, sound, humidity and comfort in reality, gives an accurate price and time per room, and lets you agree standards with the operator before mass works. The hotel operator usually wants to see the prototype before furniture and sanitaryware purchases are approved.
Read the full guideFor the interior of a detached house, BCN YARD works with three levels excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m², so a 200 m² house at Premium starts at around €200,000. Facade, roof, garden, pool or retaining walls are quoted separately item by item, after a site visit and measurements.
Read the full guideReference prices before VAT: Premium from 1,000 €/m², Luxury from 2,000 €/m², Signature from 3,000 €/m². For a remote masía, water, wastewater treatment, electricity and the road are priced separately. Resale-housing renovation estimates usually carry 21% VAT. The exact price comes from the estimate after the visit and measurements.
Read the full guideYes, but archaeological supervision and damp problems are more likely here, because the floor sits close to the ground and ancient layers. Planning conditions, wall moisture and the possibility of waterproofing are checked. Works that lower the floor or foundation need special agreement.
Read the full guideRestore them and put them back to work: repair hinges, stops, slats and catches and add seals. They darken the room, shield it from the street and improve thermal and acoustic insulation, especially in a principal. If they are destroyed, replace them with folding timber panels in the same style.
Read the full guideRenovations in old flats run late mainly because of hidden problems, deliveries and changes made mid-job. Old buildings reveal damaged timber beams, lead pipes or cast-iron stacks, and replacing shared stacks has to be agreed with the property manager. Moving a bathroom after tiling means redoing half a phase of the works.
Read the full guideIt is the market name for an upmarket building from the late 19th and first third of the 20th century, with an ornate facade, grand staircase and high ceilings. It has no legal definition, and any agent can use it. It says nothing about the building's condition, so have a technician look before you buy.
Read the full guideA flush shower in an old flat usually needs the floor slab lowered or a small raised platform, and it is not always possible without structural work. Over timber joists or Catalan vaults the floor often cannot be lowered. Decide early, because it determines the waterproofing, the drainage and sometimes coordination with the comunidad.
Read the full guideThe text of the city bylaw has no specific ban for August: the hours are the same. The building's internal rules or statutes may impose limits, and then they bind all residents. Check with the administrator in advance and remember that in August many suppliers and subcontractors are closed.
Read the full guideArras is the deposit paid when buying property in Spain, usually a percentage of the price. Most often these are arras penitenciales: the buyer can withdraw and lose the deposit, and the seller can withdraw and return double. It depends on the contract wording, so have a lawyer review it and agree the technical inspection conditions before signing.
Read the full guideHe is the arquitecto técnico, in Russian «технический архитектор» or «технадзор». Under article 13 of the LOE he is the director de ejecución de la obra: he runs the works on site, checks materials and quality and signs the certifications and the final certificate. He is not the author of the project; the architect is.
Read the full guideThere is no single figure: per 3Cat, Ter water is rich in calcium and bicarbonates, Llobregat carries more chlorides and sodium, and the source at home changes. Hardness is measured with strips in your kitchen. On the French scale 15 to 25 f is moderately hard and above 25 f hard. It is safe to drink.
Read the full guideA slim ducted unit usually needs 25 to 30 cm above the suspended ceiling where it sits, and 12 to 18 cm for the ducts in other rooms. The unit hides over the corridor or bathroom, so living room and bedroom hardly lose height. The data sheet of the chosen model gives the exact figure.
Read the full guideYes: invisible speakers mount in a wall or ceiling and are skimmed over. They sound weaker than an ordinary ceiling speaker, because the emitter works through the filler layer and highs are dulled. They are used for background sound in a living room or bedroom, and the main listening zone uses ordinary speakers.
Read the full guideThe usual solutions are splitting the worktop into two pieces with a joint whose position is decided in the design, assembling furniture on site, or lifting large items through a window or balcony with a removals hoist. A hoist in the street needs a public highway occupation permit from the City Council, which must be requested in good time.
Read the full guideYou need to check the statutes and district rules: an awning changes the facade look and may be limited in colour, shape and fixing. Comunidad approval is normally needed, especially if it is visible from the street. Town hall permission depends on whether the facade changes and how the structure is fixed.
Read the full guideIt cannot be guaranteed without a check. A stone bath with water and a person weighs 400 to 800 kg, and the CTE housing imposed load is about 200 kg/m². In an old building with beams and a vault, the floor is opened in one or two places and the engineer calculates the span. Options: strengthening, moving the bath to a load-bearing wall, or a lighter material.
Read the full guideA universal-design bathroom is an ordinary bathroom in which five things have been sorted in advance: a level-access shower, room to turn, walls reinforced for future grab bars, a door that can be opened from outside and taps that are easy to use with wet hands. It is decided during the renovation and looks like any good bathroom, with no hospital feel.
Read the full guideNot always. If outages are short, a battery with a backup output and a UPS for the network are enough. A generator makes sense for long outages, a remote plot or heavy loads such as pumps and air conditioning. It is connected only through an interlocked transfer switch, and the noise for neighbours has to be considered.
Read the full guideNo. Vinegar is acidic and dissolves calcium carbonate, leaving dull marks on the polish. Even diluted it spoils the surface after a few uses. For marble use warm water and a neutral cleaner, and against limescale wipe the water off right after a shower.
Read the full guideThe price depends on whether you build a room within a room or just reinforce one wall. For a cinema with a subwoofer there is no cheap option: you need a hung ceiling, a lining and a floating floor. We quote only after a visit and measurements, inside the overall renovation estimate, before VAT.
Read the full guideYou need at least 80 cm between the edge of the dining table and the wall or a piece of furniture to pull the chair out and stand up, and 100 to 120 cm if someone has to walk behind seated diners. Each diner needs about 60 cm of table edge. These are practical minimums, not a regulation.
Read the full guideA fitted wardrobe 3 m long and 60 cm deep takes up 1.8 m². A 2.1 × 2 m dressing room gives about 4 linear metres of frontage, a little more than the wardrobe, but takes more than twice the floor area. That is why the comparison is made on the plan in metres of hanging rail and drawers, not by eye.
Read the full guideWork is done from scaffolding or a mobile tower, not a stepladder, and each plane is painted entirely in one go. Stops at height leave visible boundaries. It is better to apply a coat from corner to corner without interruption and carry the roller or brush over the full height. That volume of work and the tower go into the estimate.
Read the full guideThey are the volumes around the bath and shower for which Spain's ITC-BT-27 sets the water protection of fixtures. The closer to the shower, the stricter it gets: IPX7 inside the bath, only extra-low voltage up to 2.25 m above, and IPX4 further out. In practice IP65 goes over the shower and switches move next to the door.
Read the full guideIn a children's room renovation, only what will be hard to change later is built in: sockets and light points, lighting, built-in wardrobe carcasses, flooring, sound insulation and reinforcements for anchoring furniture. Furniture, wall colour, textiles and decoration stay changeable and cheap to replace as the child grows.
Read the full guideAn adaptable home is not a special layout but a handful of hard-to-change decisions made in time: wide doors and walkways, a step-free floor, a level-access shower, reinforcements for future grab bars, spare electrical capacity and partitions that can be removed without touching the structure. Furniture and finishes are adjusted later without building work.
Read the full guideA concept shows the idea: layout options, visuals, a material direction. An execution project describes how to build it: dimensions, details, services diagrams, technical conditions, quantities and a detailed budget. You cannot order materials or fix a price from a concept; from an execution project you can.
Read the full guideA layout brief describes how you live: who gets up and when, where you eat, who works from home, how you host guests and what you need to store. Add a list of rooms in order of priority, the measurements of furniture you are keeping and what you do not want to change. You do not need to bring a drawn layout.
Read the full guideThe final measurement for a built-in wardrobe is taken once the walls are plastered and ready for the final coat of paint and the floor is laid. In old buildings, a lean of a couple of centimetres over three metres is normal, and the joiner handles it with scribing strips. A wardrobe made from measurements taken before plastering almost always needs adjusting on site.
Read the full guideThe art collection is taken into account before the services go in, and four things need deciding: which walls stay free of switches, sockets, radiators and doors; where partitions are reinforced for heavy pieces; what light each wall will have; and where art must not hang, such as in direct sun, above a radiator or in damp areas.
Read the full guideNo, a compact basin 30 to 45 cm wide and 20 to 35 cm deep is enough, wall-hung or in a small vanity. A wall tap saves depth. The rim is at 85 to 90 cm. Next to it, a small shelf for soap and a hook for a towel. A lit mirror gives more than enlarging the basin.
Read the full guideOnly the part of the loft with enough headroom, a floor that can take a residential load and heat that insulation can control is habitable. It helps to draw a headroom map in three zones: standing, sitting or lying, and storage only, measuring to the finished floor and ceiling. Low areas under the slope are used for built-in storage.
Read the full guideYes, if the bath zone has waterproofing, a drain and extraction, and a floor of stone, tile or microcement 60 to 80 cm wide around it. Parquet suffers from splashes. In an old building the floor is checked for the weight of a full bath, and 200 l needs more hot water than a small heater gives.
Read the full guideIn a small bathroom, real space comes from five decisions: wall-hung WC and basin on a concealed frame, a level-access shower instead of a bath, fixed glass instead of a hinged screen, a sliding door and storage niches within the wall thickness. All five are decided at design stage, before demolition; tiling and colour matter far less.
Read the full guideA wall-built bar needs 2–3 linear metres: fridge, sink, glassware cupboard and a worktop, which is enough for most households. If you want a counter with stools, allow 3 × 2 m including a 90 cm passage behind. A private lounge needs 18–25 m².
Read the full guideBecause the tile layout depends on everything else: who uses the bathroom, where the WC, basin and shower go, which sanitaryware and taps are installed, what sits inside the wall, where light and sockets are needed and how surfaces will be maintained. If you start with the tiles, the sanitaryware then has to fit them, and the compromises end up where you see them every day.
Read the full guideThe usual answer is two layers: a light sheer for daylight and a blackout curtain or roller blind for sleep, plus external shutters in Barcelona. A single fabric rarely does all three bedroom jobs: letting light in, blocking the view from outside and providing darkness.
Read the full guideA made-to-measure wardrobe is designed from the inside out: first an inventory of belongings, then the interior for those belongings, then the carcass fitted to walls and ceiling and, last, the fronts. If you start with attractive fronts from a photo, you end up with shelves of the wrong depth and a rail too low for coats.
Read the full guideFor spans up to 80 cm use plywood or solid timber of 30 mm; for 90–100 cm, 35–40 mm or a board with a stiffening edge at the front. Chipboard and MDF of 18–25 mm are only suitable for light books or short spans up to 60 cm.
Read the full guideFor storage about 10–15 °C and 55–65 per cent humidity, according to the wine-storage maker Wine Guardian. Stability matters more: swings harm the cork. The room should be dark and free of vibration. Light and vibration matter too: the room should be dark and calm.
Read the full guide