01Housing from Sitges to Sant Pere de Ribes
The Garraf is varied. Sitges' old town has traditional multi-storey houses and late-19th-century indiano mansions, with sea-view apartments along the front. Vilanova i la Geltrú has a historic centre, ordinary apartment blocks and a seafront district. Sant Pere de Ribes, Canyelles and Olivella are full of residential estates with detached houses on their own plots.
So the briefs vary too: restoring an old house while keeping its facade and details, completely reworking a flat's layout, bringing a house from the 80s or 90s up to modern standards, or building a new home on the client's own land.
02Older houses in Sitges and Vilanova
An old house has load-bearing stone or brick walls, timber beams and a roof that has been patched more than once. Rising damp at the base of the walls is common, and so are outdated services throughout. Before committing to a timeline or price we check the structure and, if needed, bring in an engineer.
Inside, these houses often cry out to be opened up: removing later partitions, exposing the beams, bringing light into the inner rooms. It can be done, but every wall we plan to touch is checked first to see whether it carries load.
Historic centres may have specific rules for facades, windows and roofs. Exactly which ones depends on the building and the town hall. We find out in advance so the design accounts for them from day one.
03Houses with plots, and the sea air
On residential estates, much of the work is around the house rather than inside it: the pool with new waterproofing and equipment, terraces, retaining walls, drainage, facade and roof. Many owners add solar panels and an air-source heat pump during the rebuild, and we price those options separately.
Closer to the sea, salt and humidity come into play. For railings, fixings and outdoor equipment we use materials that hold up in that climate, and we tackle indoor damp with ventilation and waterproofing rather than cosmetic fixes.
If the house is let over the summer, or you arrive for the season yourself, we plan backwards from the date it has to be ready and tell you up front what is realistic.
04Permits
The Garraf covers several municipalities, each with its own rules. Which permit your work needs is decided by the relevant town hall, based on the scope. On residential estates, planning rules also apply: setbacks, height and buildable area.
We check all of this before quoting. If the project needs an architect, we bring one in and handle the paperwork together so the work can start on time.
05What it costs
Guide prices, excluding VAT: Premium from €1,000/m², Luxury from €2,000/m², Signature from €3,000/m². In an old house, the structure drives the price most; in a house with a plot, it is the pool, facade and roof.
The exact figure comes from an itemised quote after the site visit and measurements, with every task and every material on its own line.
06How we work in the Garraf
We reply to enquiries within an hour and arrange a visit. We look at the property, take measurements and prepare the design and an itemised quote.
Our own crew does the work, with trusted subcontractors on specialist trades. One project lead is responsible for the job and is your contact, in Russian or Spanish. Payment is staged under the contract, with the payment schedule agreed before work starts.
If you are still house-hunting, we can visit a property before you buy and assess how much work it really needs. That is especially useful for old houses in the historic centres, where what matters is hidden inside the walls and floors.
Frequently asked questions
Is a geotechnical report needed to renovate a hillside house?+
Not for cosmetic work, but when replacing retaining walls, adding a storey or building a new pool, yes: the foundation and wall design depends on it. The study costs less than repairing a wall that has moved. It is commissioned before the design.
Can a pool be built on a slope?+
Yes, often with a fine result: an infinity edge opens up the view. But a shell on a slope needs a retaining wall, drainage and a ground-load calculation. The pool goes on a terrace cut into the slope, not on fill, and that is included in the budget.
How much more does a hillside renovation cost than on flat ground?+
It costs more, because walls, drainage, awkward access and hand work are added. No universal percentage surcharge can be given: it depends on the plot. The real difference shows in an estimate after a visit and measurements, where these items are priced separately.