BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

Opening an office or shop in Barcelona: filing the activity notice yourself

Most offices and shops in Barcelona need an activity notice rather than a licence. You can file it yourself on the Oficina Virtual, though almost always with a technician's certificate.

Centre room · completed work · child psychology centre, Barcelona
BCN YARD project · Child psychology centre, Barcelona

Which permit do you need to open premises in Barcelona, and who files it?

To open an office, shop or studio in Barcelona you need an activity permit (permís d'activitat). Which one is set by the OMAIIAA, the city's activities and environmental intervention ordinance. Since its adaptation to Catalan Law 18/2020 it has three regimes: environmental authorisation (annex I), licence (annex II) and notice (annex III). Ordinary offices and shops usually fall under annex III: you file a notice (comunicat) instead of waiting for a licence.

Annex III has three variants: III.a, notice with certification from a control body (ECA); III.b, notice with a project and a technical certificate; III.c, notice with a technical certificate only. Annex III has no variant without a technician: at minimum you need a certificat tècnic signed by a qualified professional.

The activity holder or their representative files it online through the City Council's Oficina Virtual de Tràmits. It is a two-step process: first the prior query «Consulta del permís per iniciar una activitat», then «Tramitació d'expedients d'activitats», where the notice is filed.

When is a comunicat d'activitat enough, and when does another regime apply?

A notice is needed to start a new activity and to substantially change an existing one. Examples: a consultancy in a former ground-floor shop in the Eixample; a clothing shop in Gràcia; a design studio in Poblenou. The regime depends on the address, the activity heading (epígraf) and its parameters: floor area, capacity, installed equipment. So the same shop can fall under different regimes on two different streets.

When a notice is not enough: businesses with customers and noise, such as bars and restaurants, often need a licence or extra reports. In Ciutat Vella several activities first need a Pla d'Usos preliminary report. If the query comes back «Consulta tècnic/a» or «No compatible per suspensió», you will need a planning compatibility report. Healthcare and childcare centres also have sector rules; from our own work, a child psychology centre in the Eixample where licensing the medical activity ran alongside the fit-out.

Outside Barcelona, for instance in Castelldefels, the same Law 18/2020 applies with local rules; many town halls take notices through the Finestreta Única Empresarial on the Generalitat's Canal Empresa.

Activity licence or opening licence: what is the difference?

“Opening licence” is the old, colloquial name for the permit that lets premises operate. Barcelona’s bylaw, the OMAIIAA, does not use it: it sets environmental authorisation, licence or notice depending on the annex the activity falls under. So when someone asks for “the opening licence” of an ordinary office or shop, what usually applies is an activity notice with a technical certificate.

An activity licence in the strict sense is for annex II, such as many bars and restaurants with customers and noise: it is requested before the works, the City Council has six months to decide, silence means refusal, and you cannot open before the decision.

Which documents must be prepared, and who prepares them?

You: a digital ID (idCAT Mòbil, Cl@ve, idCAT Certificat or another recognised certificate), the holder's tax number (NIF), the prior query code, a confidentiality declaration for project data, and a declaration that you will take out civil liability insurance before opening.

The technician: the certificat tècnic, signed by a qualified professional responsible for starting up the activity according to the project. For III.b, also the project: report, budget and drawings (site plan, floor plan and section).

The control body: for III.a, the ECA certification. You request it once works are finished, with the project and the installation completion certificate; the City Council website lists the accredited bodies.

Any reports the query requires: fire safety, Pla d'Usos, planning compatibility. The exact list for your case comes out of the query itself as a route sheet (full de ruta).

How do you file a comunicat d'activitat, step by step?

1. Before signing the lease, run «Consulta del permís per iniciar una activitat» on the Oficina Virtual: «Inicia el tràmit», option «Consultar el tipus de permís per començar una activitat», address, activity and parameters. The result shows the regime, compatibility and documents, and the query code is valid for six months.

2. If the premises need works, permit them separately first (works notice or licence). The activity notice is filed once works and installations are finished and the premises are ready to operate.

3. Get the certificat tècnic from the technician and, for III.b, the project; for III.a, obtain the ECA certification.

4. File «Tramitació d'expedients d'activitats»: log in with a digital signature, enter the query code and NIF, upload the documents on the route sheet and sign. The same holder or representative who ran the query must file. If the rules have changed since the query, the system will show new parameters or ask for a fresh query.

5. Pay the ICIO construction tax. According to the City Council website in 2026, for notices it is 4% of the cost of works or installations. 6. Per the procedure page, you can start trading the day after filing the complete documents with the tax paid.

What happens after you file the comunicat d'activitat?

A notice is not a permit in the classic sense: the City Council checks the file and the activity after you open. Keep a copy of the notice, the technical certificate and the insurance policy on the premises; inspectors can call at any time and will issue a notice to fix any breaches.

If your activity falls under the licence regime, the logic changes: you apply before works, the Council has six months to decide and silence means refusal. You cannot open before the decision.

An often forgotten duty: if you have no private waste collection contract, you pay the municipal commercial waste collection charge; how to pay is explained on the Institut Municipal d'Hisenda website.

How much does the activity permit cost in Barcelona and how long does it take?

With a notice, you pay the ICIO, which the City Council sets at 4% of the cost of works or installations for 2026, plus the fees of the professional who signs the certificate and, if needed, the project. The activity can start the day after filing the complete package with the tax paid; the prior consultation code is valid for six months.

With a licence, the timing is the decision period: up to six months, with silence meaning refusal. In both cases the real schedule depends on the works on the premises, which are processed first and separately.

What mistakes are common when notifying a business activity?

Signing the lease before the query. The premises may turn out incompatible with your activity after the contract is signed.

Opening before filing. You may only operate from the day after complete filing with the tax paid.

Wrong activity heading. If the activity or capacity is misstated, the regime and documents will be wrong too and the notice will have no effect.

An expired query. The code lasts six months; if the fit-out drags on, you run the query again.

Someone else filing. The notice must be filed by whoever's NIF appears on the query, or the system will not accept it.

Forgetting insurance. You sign the declaration when filing, and the policy must be in force before you open.

What should you check before filing the comunicat d'activitat?

The OMAIIAA annexes and forms change, so check the current pages for both procedures on the City Council's Oficina Virtual before filing. If you would rather not deal with it, BCN YARD can handle the activity permit together with the fit-out.

Frequently asked questions

Do I need an activity licence to open premises in Barcelona?

It depends on the OMAIIAA regime. Most offices and shops fall under annex III and open with an activity notice, not a licence; annex II activities, such as many bars and restaurants with customers and noise, need a licence. The regime depends on the location, the activity category and its floor area, capacity and installations.

Which permit does an office or shop need to open in Barcelona?

An office or shop in Barcelona needs a permís d'activitat under the OMAIIAA ordinance, which has three regimes: autorització ambiental (annex I), llicència (annex II) and comunicació (annex III). Ordinary offices and shops usually fall under annex III and file a comunicat rather than waiting for a licence. Even then, at least a certificat tècnic signed by a competent professional is required.

How long is the activity permit pre-consultation valid in Barcelona?

The code from the 'Consulta del permís per iniciar una activitat' is valid for six months. The consultation is done on the Oficina Virtual before signing a lease, and it gives the regime, compatibility and a route sheet of documents. If works run beyond six months, the consultation must be repeated, and the comunicat is filed by the same holder.

When can premises open after filing the comunicat d'activitat?

According to the procedure page, the business may start the day after a complete file is submitted and ICIO is paid, which according to the Ajuntament for 2026 is 4% of the cost of works or installations. The Ajuntament checks after opening, so keep a copy of the comunicat, the technical certificate and the insurance policy on the premises.

Can a bar or restaurant in Barcelona open with just a comunicat?

Often not: bars and restaurants, with customers and noise, usually fall under the licence regime or need extra reports. In Ciutat Vella some activities first need an informe previ de Pla d'Usos. Under a licence, the application goes in before the works, the Ajuntament has six months to decide, silence means refusal, and you may not open before the decision.

Can the business open while the licence is being processed?

With a notice, yes, from the day after filing it complete with the ICIO paid; the City Council checks afterwards. With a licence, no: you must wait for the decision.

Sources

seuelectronica.ajuntament.barcelona.cat

seuelectronica.ajuntament.barcelona.cat

ajuntament.barcelona.cat

ajuntament.barcelona.cat

canalempresa.gencat.cat

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property