Hillside houses in Garraf: retaining walls, drainage and access

A hillside house in the Garraf depends on its retaining walls, water in the ground and a narrow road. How to tell a wall is dangerous, where damp comes from, how to deliver materials and what adding a storey requires.

Concrete structure · work in progress · house with a pool
BCN YARD project · House with a pool

How do you tell that a retaining wall is dangerous?

A wall is dangerous if it leans or bulges, shows horizontal or stepped cracks, damp patches and no outlet for water. If you notice a displaced top, sunken ground behind the wall or streaks after rain, an engineer examines it, not the foreman.

Signs by level of alarm. Fine vertical hairline cracks are often harmless. Horizontal cracks and bulging say the soil pushes harder than the wall holds. White efflorescence and wet streaks mean water passes through the masonry, and has for years. Tree roots behind the wall open the joints. A dry-stone wall worked for decades until a pool was built nearby or fill was added.

A hillside house in the Garraf stands on limestone and red clay, September and October bring downpours, and a wall that held through a dry summer takes extra water and load in a single storm.

How is a retaining wall reinforced or replaced?

The decision depends on height, condition and ground. Low walls, up to 1–1.5 m, are often restored: joints cleaned, drainage added and a reinforced facing built. Above 2 m the wall is normally calculated and designed by an engineer, and there is no room for improvisation.

Options. A reinforced concrete wall on its own footing with drainage. An anchored wall tied into the ground when space is tight. Micropiles if the base is weak. Gabions and dry stone with geotextile, where suitable, on small drops and with good drainage.

The main thing in any wall is not strength but drainage: behind the wall go a 30–50 cm layer of gravel, geotextile and a perforated pipe of about 100 mm, and water is led to channels. Without that, the wall works as a dam. The sequence for a replacement: temporary propping, replacing in sections of 2–3 m so the area does not collapse, and only then the garden. A geotechnical study of the plot is done before design, as we covered in the article on topography and geology.

Why is the lower floor of a hillside house damp?

Because the lower floor leans into the slope and water in the ground pushes against the wall with nowhere to go. Houses from the 70s and 80s often have no waterproofing, and in later ones it is broken or does not reach the top. The wall absorbs water by capillary action and stains appear as soon as the ground is soaked.

The cure goes on the outside, not the inside. The wall is excavated, cleaned and waterproofed, a dimpled drainage membrane is fitted, and a drain pipe at the foot is laid to falls with an outlet. Interior plaster is not painted with waterproof paint: moisture goes behind it and comes back.

Where outside excavation is impossible, an internal perimeter drain under the floor with a sump and pump is installed, with a ventilated lining and an air gap. It works but needs servicing. In lower rooms moisture-resistant finishes and ventilation with heat recovery are used, or the mould returns. Bedrooms should not go below ground: the basement is given to plant, a wine cellar or a gym.

How do you manage water on a slope during a downpour?

Water on a slope takes the shortest route, and the task is to keep that route from running through the house. Above the house an interceptor channel or drainage ditch takes water off the slope and diverts it sideways. Across the plot go gullies, soakaway pits and a cascade of stone steps that slows the flow.

In the Garraf in autumn there are downpours with a hundred millimetres in a day. For that load, an engineer calculates from the catchment area. Where the water is released is decided in advance: it cannot be discharged to the neighbouring plot or the road without permission, and connecting to the storm drain needs a design.

Gravel and stone paths absorb water better than tiles on mortar. The terrace, garden and pool are part of the general drainage scheme, as we covered in the article on coordinating pool and garden.

How do you deliver materials along a narrow street?

It is planned in advance and differently from a flat plot. A large tipper and a mixer will not get through: small trucks, a mini excavator and a mini dumper are used. Concrete is pumped across the garden through a hose of tens of metres, sometimes with a loader crane. Heavy items are lifted by crane with a road occupation permit, and a narrow street is closed during the lift.

The delivery schedule is agreed with neighbours: deliveries in the morning, in short windows, with no waiting in the street. Materials are stored on the plot rather than at the kerb. Waste is removed in small skips as it accumulates.

Checks beforehand: turning radius, height of cables and branches, load on a bridge or the retaining wall beside which machinery passes. There are roads where an 18-tonne truck cannot pass along a wall, and this is found out before buying. The road occupation permit, crane and machinery parking are counted into the programme and the estimate. We covered site access separately.

Can you add a storey to a hillside house?

Yes, if height, buildable area and bearing capacity allow it. Height under the municipal plan on a slope is measured from a reference level that varies across the plot, and a semi-basement dug into the slope sometimes does not count as a storey. This is decided by the specific planning rules, and the conclusion comes from the ayuntamiento's report, not from the neighbour's house.

Then the structure. Foundations and walls must be checked because the new storey adds load. If capacity falls short, a lightweight extension on a steel or timber frame is built. Geotechnics on a slope matter too: the ground under the footing must take the increase without settlement.

Neighbours' views also count: a storey that blocks a view provokes objections and sometimes refusal. So the design is coordinated on heights before submission. If the house is in a protected zone or beside the Parc del Garraf, the rules are stricter.

Where to start and how BCN YARD can help

With an inspection of the plot and the walls, then a geotechnical report and a report from the ayuntamiento. After that the water and access scheme is drawn up, and only then the house design and garden. The reverse order, drawing facades first, is expensive on a slope.

BCN YARD runs renovation and house construction on the coast and in the Garraf turnkey. We work in Russian and Spanish, with our own crew and trusted subcontractors, and one person responsible. The price comes in the estimate after a visit and measurements, with payment under contract in stages, and we answer enquiries within an hour.

Frequently asked questions

Is a geotechnical report needed to renovate a hillside house?

Not for cosmetic work, but when replacing retaining walls, adding a storey or building a new pool, yes: the foundation and wall design depends on it. The study costs less than repairing a wall that has moved. It is commissioned before the design.

Can a pool be built on a slope?

Yes, often with a fine result: an infinity edge opens up the view. But a shell on a slope needs a retaining wall, drainage and a ground-load calculation. The pool goes on a terrace cut into the slope, not on fill, and that is included in the budget.

How much more does a hillside renovation cost than on flat ground?

It costs more, because walls, drainage, awkward access and hand work are added. No universal percentage surcharge can be given: it depends on the plot. The real difference shows in an estimate after a visit and measurements, where these items are priced separately.

Sources

Spanish Technical Building Code, DB SE-C Foundations: drainage of retaining walls

Catalan Civil Code, Book Five (Law 5/2006), art. 546-9: flow of water between plots

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property