
What needs deciding before choosing bathroom tiles?
Before choosing bathroom tiles, six things need deciding: who uses the room and how, where the toilet, basin and shower go, which models of sanitaryware and taps you are fitting, what goes inside the walls (frames, valve bodies, drains, extraction), where light and sockets are needed and how the surfaces will be looked after. Tiles come last, because the tile layout depends on all of the above.
Start with the tiles and you end up fitting the sanitaryware around them, with the compromises landing exactly where you see them every day.
Who will use the bathroom, and how?
A couple getting ready for work at the same time needs two basins and perhaps a separate WC. A guest bathroom manages with a compact basin and a shower. With young children, a bath is more practical than a shower for the first years. If elderly parents visit, think about a level-access shower, grab rails and room for a seat; our article on accessible bathrooms covers this in detail.
List the morning and evening routines and the priorities: shower or bath, surface space by the basin, closed storage. Mark how doors and units open and check the circulation. A second basin added purely for symmetry, with no elbow room between the two, gets in the way more than it helps.
How are the layout and sanitaryware models decided?
The toilet position is set by the soil stack; the shower position by whether a fall to the drain can be achieved. The layout is built from that. How to squeeze space out of a small bathroom is covered in a separate article; here the order of decisions matters more.
After the layout come the models, because they determine what is hidden in the wall. A wall-hung toilet needs a frame. A concealed shower valve needs a body from a specific manufacturer, fitted before tiling. A ceiling-mounted rain shower needs an outlet in the ceiling and enough height. Changing the model after the body is installed usually means replacing the body too and opening up the tiles around it.
Which water, air and electrical systems are concealed in the bathroom?
Drainage, waterproofing and ventilation are coordinated by the responsible professionals based on the systems chosen. A catalogue picture does not prove it can be done in your home: a level-access drain needs enough depth in the floor slab, and extraction needs a duct to the outside.
Electrics near water have their own rules. Spain's low-voltage electrical regulations define zones around baths and showers in which the type of equipment and its protection rating are restricted. So mirror lighting, a socket by the basin, a demisting mirror or an electric towel rail are planned with the electrician according to those zones, before plastering, not improvised after tiling.
How does Barcelona's hard water affect bathroom upkeep?
Water in and around Barcelona is hard, and limescale builds up quickly. Matt black taps and dark tiles show it most. Glass with an anti-limescale coating is noticeably easier to clean than standard glass. Cement grout in a shower darkens and needs care; epoxy grout lasts longer, but laying with it costs more.
Natural stone is porous: it is sealed and cleaned with the products the supplier recommends. A "stone look" does not define the material: marble-effect porcelain and real marble are maintained differently. Read the manufacturer's care advice for each finish and compare samples before ordering.
Why is the tile layout done after the sanitaryware?
With everything above decided, the tile setting-out is drawn. On the drawing, joints are lined up with the centre lines of the toilet, basin and taps, niches are sized to the tile to avoid thin cuts, and the starting line is chosen so that full tiles sit where the eye falls most.
This is where it becomes clear which format suits. Large slabs mean fewer joints, but in a small bathroom with many outlets they turn into a patchwork of cuts. A mid-size format sometimes lays out more cleanly. You cannot see that without a setting-out drawing, and on the wall it is too late.
How do you organise the selection for one or two bathrooms?
Put sanitaryware, taps, vanity, mirrors, lighting, accessories and tiles into one list with references and statuses. Flag anything undecided and confirm compatibility before buying: a valve body from one manufacturer and a trim from another will not fit together.
If there are two bathrooms, as in the 109.80 m² Urgel flat in the Eixample, it helps to give each a role and work out its own scenarios rather than copying one design twice. We agree the selection and scope for your bathroom after visiting and studying the room.
Frequently asked questions
Why are bathroom tiles chosen last?
Because the tile layout depends on everything else: who uses the bathroom, where the WC, basin and shower go, which sanitaryware and taps are installed, what sits inside the wall, where light and sockets are needed and how surfaces will be maintained. If you start with the tiles, the sanitaryware then has to fit them, and the compromises end up where you see them every day.
What determines where the WC and shower go in a bathroom?
The WC position is set by the soil stack, and the shower's by whether a fall towards the drain can be made. The layout is built on that, and then the models are chosen, because they determine what goes inside the wall: a wall-hung WC needs a frame, and concealed taps need a specific manufacturer's body installed before tiling.
Where can sockets and lights go near the shower?
Spain's Low Voltage Electrotechnical Regulation defines zones around baths and showers that limit the types of equipment and their protection rating. That is why mirror lighting, the socket by the basin, an anti-mist mirror or a heated towel rail are planned with the electrician according to those zones, before plastering and not after tiling.
Which bathroom finishes are hardest to keep clean with Barcelona water?
Barcelona water is hard and limescale appears quickly. Matt black taps and dark tiles show it most. Glass with an anti-limescale treatment is much easier to clean than standard glass. Cement grout in the shower darkens, while epoxy lasts longer but costs more to lay. Natural stone is porous and needs a water-repellent treatment.
Sources
Low Voltage Electrotechnical Regulation (RD 842/2002), ITC-BT-27: rooms containing a bath or shower
Spanish Technical Building Code, DB HS 3 Indoor air quality (dwellings)