BCN YARD / Barcelona
Budget calculators
Three tools to structure an initial conversation: apartment renovation, commercial fit-out and house construction. Each project type needs a different scope and checks.
Apartment renovation
Plan an apartment renovation budget in Barcelona using area and BCN YARD starting levels, excluding VAT. An indicative tool, not a project quote.
Open tool 02Commercial fit-out
Organise works, services, business adaptation and professional fees before arranging a technical visit.
Open tool 03House construction
Separate studies, design, structure, envelope, services and external works. Renovation rates do not apply to new builds.
Open tool01 / How to read the result
Data, sources and review
The residential tool uses starting prices supplied by BCN YARD: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m², excluding VAT. These are BCN YARD references for high-level projects, not market averages, a quote or a fixed scope. The other tools add only amounts entered by the visitor; a blank item remains unpriced. Each line in any future price book needs a unit, scope, source, date and human review.
VAT is not calculated automatically: the rate depends on the transaction and legal conditions. The Spanish Tax Agency describes a general 21% rate for residential renovation or repair and a 10% rate only when the applicable conditions are met. Confirm treatment for your project before budgeting.
Official VAT guidance for residential works · Official source checked on 25 September 2026.