BCN YARD
A clear path. From start to finish.
Before you buy or lease, we help you check the premises suit your business. Then we run design, works and specialists through to opening.
Apartment or house
- 01
Enquiry and site visit
We reply within an hour and arrange a visit. On site we assess the condition, take measurements and talk through what you want to achieve.
- 02
Design and quote
We prepare the design and an itemised quote, with every task and material on its own line. Before work starts you can change anything, knowing exactly what it costs.
- 03
Construction
Our own crew and trusted subcontractors do the work, with one project lead in charge. Payment is staged under the contract.
- 04
Handover and check
We walk through the property with you and check the result against the quote. We fix anything that needs fixing, then hand over the keys.
Business and commercial premises
01Choose and assess
We discuss your goals and property options. Before you buy or lease, we tell you what needs a technical check.
02Check suitability
Layout, accessibility, systems and intended activity are checked with the relevant specialists.
03Survey and define
We visit, measure and record the condition. What is confirmed is kept apart from what needs checking.
04Develop the design
We agree layout, materials and solutions. Architects and engineers prepare the technical design.
05Estimate and plan
We set out items, quantities, exclusions, taxes and sequence. Every assumption is stated.
06Coordinate procedures
We prepare documents with the specialists. Procedures depend on the property, municipality and activity.
07Build and monitor
We run the crew, check each stage and keep you informed. Changes are priced and agreed with you first.
08Review and hand over
We check the finished work, list any snags and fix them before handover.
09Prepare for opening
For businesses, we close out the final steps with specialists and operators up to opening.
BCN YARD / Contact
Tell us what you have in mind.
Service area: Barcelona and the wider province.
- Own crew and trusted subcontractors
- We speak Russian and Spanish
- Reply within an hour
- Staged payments under contract