Bespoke storage: plan the inside before the doors

Bespoke furniture is designed from the inside out: first the items and fittings, then the carcass, and only then the doors. What to check before production.

Hallway · completed work · Eixample flat, Barcelona
Project photograph: Urgel · BCN YARD

In what order is bespoke storage designed?

Bespoke storage is designed in this order: an inventory of items, internal fittings for those items, a carcass adapted to the walls and ceiling, and only at the end the fronts. Start with nice doors from a photo and you end up with shelves of the wrong depth and a rail too low for coats.

The principle is the same for a bedroom wardrobe, an entrance cupboard, a storeroom or bookshelves. Other articles cover built-in wardrobes, walk-in closets and entrance halls. This one sets out the general method we apply to all bespoke furniture in a flat or a house.

How do you inventory your belongings before designing storage?

Split your belongings into three groups: daily, occasional and seasonal. Daily items belong between knee and shoulder height, with no step ladder and no bending. Occasional items go higher or lower. Seasonal items go in top cupboards and at the back.

You do not need to count every shirt. It matters more to measure the bulky things: suitcases, the vacuum cleaner, the ironing board, boxes of Christmas decorations, sports gear, a pushchair. Those are exactly what never fits a standard wardrobe and ends up in a corner of the room. And leave spare capacity, roughly one section: belongings grow over time, and a wardrobe that is 100% full on the drawing overflows from day one.

What internal dimensions does a made-to-measure wardrobe need?

Clothes on hangers need about 60 cm of depth. Short items such as shirts and jackets need roughly a metre of height, so one section can take two rails, one above the other. Coats and dresses need a section about 1.5 m tall with a single rail.

Shelves for folded clothes work well at about 30 cm spacing; any higher and the stacks topple. Drawers beat shelves for underwear, socks and accessories, and for shoes use pull-out shelves with a lip. Draw each section with dimensions and a note of what goes in it. That drawing, not a magazine photo, is the brief for the joiner.

How do you check the unit works with doors and drawers open?

Draw the furniture on plan with doors open and drawers pulled out. Check where you will stand with the bottom drawer open, whether a door hits the bed or another door, and whether there is enough clearance. A clean front in a picture can hide a section you cannot actually get into.

Hinged doors need space in front; sliding ones do not, but they only ever open half the unit at a time. In a narrow corridor in an Eixample flat that difference is decisive. A drawer behind a hinged door has to clear the hinges, and that is checked on the drawing, not on site.

How do you fit bespoke storage to walls, ceilings and concealed doors?

In Barcelona's older buildings the walls are rarely straight, and Eixample ceilings are often above three metres. That is where floor-to-ceiling furniture pays off: the top section takes seasonal items and the wardrobe does not gather dust on top. But it is measured only after plastering and levelling, or the gap at the ceiling ends up covered with a filler strip.

If you want the wardrobe to read as wall, the fronts sit flush with it, handleless and in the same colour. In the child psychology centre in the Eixample we made 24 concealed doors on this principle. In a home it demands the same precision: gaps, hinges and push-to-open mechanisms are chosen in advance, and the wall around the unit is brought to a perfectly flat finish.

What should the order for bespoke furniture specify?

The order should list carcass and front materials with thickness, finish and edging, hardware with manufacturer and series, the internal fittings section by section, and any interior lighting and sockets. Clarify who takes the final measurement and when, how junctions with walls and ceiling are handled, and who installs.

Cable for lighting and a charging socket inside the unit go in before plastering, so furniture lighting is decided at the renovation design stage. In our renovations bespoke furniture has its own line in the quote. When comparing offers, check that the content is the same, not just the final price.

Frequently asked questions

Where do you start when designing a made-to-measure wardrobe?

A made-to-measure wardrobe is designed from the inside out: first an inventory of belongings, then the interior for those belongings, then the carcass fitted to walls and ceiling and, last, the fronts. If you start with attractive fronts from a photo, you end up with shelves of the wrong depth and a rail too low for coats.

What are the internal dimensions of a wardrobe for hanging clothes?

Hanging clothes need about 60 cm of depth. Shirts or jackets need about a metre of height, so two rails fit in one module; coats and dresses need a module about 1.5 m high with a single rail. Shelves for folded clothes work well about 30 cm apart.

Where should everyday items go in a wardrobe?

Everyday items should sit between knee and shoulder height, with no stepladder and no bending. Occasional items go higher or lower, and seasonal ones in top cupboards and at the back. Measure bulky things such as suitcases, the vacuum cleaner or ironing board, and leave roughly one module free for the future.

When is a floor-to-ceiling wardrobe measured?

A floor-to-ceiling wardrobe is measured after plastering and levelling of walls and ceiling; otherwise the gap at the ceiling has to be covered with a strip. In Barcelona's old buildings walls are rarely straight and in the Eixample ceilings are often over three metres, which is why full-height units with top cupboards pay off.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property