BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

BCN YARD

One studio. From design to handover.

BCN YARD is an interior design, turnkey renovation and house construction studio in Barcelona and the wider province. Design, budget and build stay in the same hands: we study the property, propose layouts and materials, and settle each decision with the people who build it. Visuals, documents and progress tracking live in digital tools.

Yaroslav Galinsky, founder of BCN YARD

Yaroslav Galinsky · founder and sole director of BCN YARD

Your everyday life is our starting point.

First we learn how you live and what the property allows. Then layout, materials and lighting, with digital measuring and visualisation. Every decision is checked against the budget. On site we work from current drawings, log every change and review each stage.

Work coordination and quality control

BCN YARD / PEOPLE

The people behind the project.

Design and construction are one process for us. The project lead runs everyone involved and answers to you for the project. Specialist technical tasks go to qualified professionals.

Yaroslav Galinsky

Founder and project lead

Yaroslav Galinsky

Overall direction, client decisions and project coordination.

Vladimir Ivanov

Site coordination

Vladimir Ivanov

Work stages and coordination between trades.

José Luis Cobano Navarrete

Technical architect

José Luis Cobano Navarrete

Tasks that need a technical architect, as each project requires.

Verifiable details

Company
BCNYARD, SLU
Tax number
B21924758
Incorporated
28 April 2025
Public liability insurance
Hiscox, S.A., Sucursal en España · 300.000 € per claim · policy HD IP6 3594246, valid until 13/05/2027
Service area
Barcelona and the wider province

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property