BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Where we work

Renovation and construction in Castelldefels

We carry out turnkey renovations of apartments and houses, and build and rebuild homes in Castelldefels. Our office is here, on Avinguda 348, so site visits and day-to-day supervision do not involve long drives.

01

What gets renovated and built here

Castelldefels is really several towns in one. On the slopes of Montmar and Bellamar you find detached houses with sea views, terraces and pools. Near the beach it is mostly apartments and townhouses, many built as summer homes and now being adapted for year-round living. The centre has apartment blocks from several decades.

Typical projects: a complete rebuild of a newly bought house, a new layout that merges rooms and opens the living area onto the terrace, a new kitchen and bathrooms, or refreshing a seafront flat before letting it or moving in. We also build new houses on the client's own plot, from design through to handover.

02

Houses: plot, pool, facade and roof

A house on a slope has its own weak points. Retaining walls and drainage decide whether storm water leaves the plot or ends up in the basement. Pools eventually need new waterproofing, lining and filtration equipment. Facades crack and fade in the sun, and flat roof terraces start leaking wherever the waterproofing has not been renewed for years.

We look at the whole house, not only the rooms you want to change. If it makes sense to insulate the facade, replace windows or add solar panels at the same time, we price those as separate line items so the decision stays yours.

03

Seafront flats: damp and salt

Sea air eats metal: railings, fixings, aluminium frames, the outdoor units of air conditioners. So near the sea we pick materials made for that climate, such as grade 316 stainless steel, properly coated profiles, and paints and grouts designed for damp conditions.

The other issue is moisture indoors. When a flat has been shut up for a long time, mould often appears in bathrooms and on external walls. We deal with the cause, meaning ventilation and waterproofing of terraces and junctions, rather than painting over the stain.

04

Permits

Which permit you need is decided by Castelldefels town hall, based on the scope of work. Replacing a kitchen in a flat is not the same as extending a house, adding a pool or changing the facade, and each case comes with its own requirements. In apartments, the building's community rules also apply.

We check this before quoting, so the timeline and the cost of the paperwork are in the quote from the start. If the project needs an architect, we bring one in and handle the documents together.

05

Full renovation of flats and houses in Castelldefels

Our office is in Castelldefels, so site visits and measurements involve no long trips. In a full renovation of a flat or a detached house we coordinate building work and partitions, plumbing and electrics, kitchen, bathrooms, joinery and finishes, and for houses also the facade, roof, terraces and pool.

We also work in Gavà, Gavà Mar, Bellamar and the rest of Baix Llobregat. The estimate is itemised after the visit, with the works programme and exclusions written down from the start.

06

What it costs

Guide prices, excluding VAT: Premium from €1,000/m², Luxury from €2,000/m², Signature from €3,000/m². For a house, work outside the rooms has a big effect on the total: the plot, the pool, the facade and the roof. We price those separately.

The exact figure comes from an itemised quote after the site visit and measurements, with every task and every material on its own line.

07

How we work in Castelldefels

We reply to enquiries within an hour. With the office in the same town, a measuring visit is easy to arrange, and the project lead can get to site without crossing half the province.

Our own crew does the work, with trusted subcontractors on specialist trades. You deal with one person, in Russian or Spanish. The design and itemised quote are ready before work starts, and payment is staged under the contract.

If you are still house-hunting, we can look at a property before you buy and estimate the scope of work. That makes it easier to negotiate and to know what budget you will need once the deal is done.

Frequently asked questions

How much does a flat renovation in Castelldefels cost?

A full renovation of a flat or house in Castelldefels with BCN YARD starts at €1,000/m² excluding VAT at Premium level, €2,000/m² at Luxury and €3,000/m² at Signature. A 100 m² flat at Premium level starts at around €100,000. The exact figure comes from the quote after a site visit and measurements.

Which materials suit a home near the sea in Castelldefels?

In a home near the sea, screws, balustrades, hinges and terrace brackets are best specified in A4 stainless steel (AISI 316) rather than ordinary galvanised steel, because salt air attacks metal faster. It also needs well-planned extraction in bathrooms and kitchen against mould, and south-facade and terrace finishes that do not fade and are easy to clean.

What should be checked before renovating a house with a plot?

Before renovating a house with a plot, check the roof and flat terraces, how rainwater drains around the foundations, outdoor services such as pumps and pool equipment, external joinery, and the paperwork: whether what is built matches the Catastro and the licences. An enclosed terrace or porch added without a permit can complicate both the renovation and a future sale.

Related services

Turnkey home renovation Turnkey house construction Building rehabilitation Interior design Site visits and measured surveys Building and activity permits Itemised estimates and planning

Luxury renovation in this area

Luxury renovations in Castelldefels Luxury villa renovation in Bellamar, Castelldefels Luxury villa renovation in Gavà Mar Luxury renovations in Gavà and Gavà Mar

Guides about this area

Building permits in Castelldefels, Sitges and Sant Cugat: how they differ from Barcelona Castelldefels by neighbourhood: Montemar, Bellamar and Playa Flat or house renovation in Castelldefels A Bellamar villa: plot and renovation programme All guides

Separate the home from external works

For an apartment, prepare a plan, floor area and photographs of the spaces to be changed. For a house, add the plot, access and external areas in scope. Identify known damp or other problems so their causes can be assessed before choosing finishes.

Terraces, roof, façades, pool and drainage need their own line items when included. This lets you compare interior work on the same basis and decide separately which external works to include.

Interior renovation scope

Quote with clear exclusions

Plan external works

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property