BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU
Visualization: Mediterranean interior with natural materials and warm light

Luxury Renovations & Interior Design in Barcelona

A space.you want to live in.

BCN YARD designs interiors, delivers turnkey renovations for homes and commercial spaces, and builds houses in Barcelona and the wider province. One coordinated team from the idea, design and survey to construction and handover.

Barcelona and the wider provinceConcept visualisation↓
Interior designTurnkey renovationHouse constructionWork coordination

02 / Process

What you receive at each stage

01

Brief and survey

Your priorities, needs and property measurements.

02

Agreed design

Layout, materials and drawings.

03

Estimate and schedule

Line items, exclusions and work sequence. No change without your approval.

04

Delivery and handover

Site management, regular updates and a final walkthrough.

How we work

BCN YARD / PEOPLE

The people behind the project.

Design and construction are one process for us. The project lead runs everyone involved and answers to you for the project. Specialist technical tasks go to qualified professionals.

Yaroslav Galinsky

Founder and project lead

Yaroslav Galinsky

Overall direction, client decisions and project coordination.

Vladimir Ivanov

Site coordination

Vladimir Ivanov

Work stages and coordination between trades.

José Luis Cobano Navarrete

Technical architect

José Luis Cobano Navarrete

Tasks that need a technical architect, as each project requires.

BCN YARD / Premium interiors

Renovation for those who value quality in every detail.

We design individual interiors and coordinate their turnkey delivery, from layout and materials to building services and final finishes.

Starting budget for a full renovation

from 1 000 €/m²

excluding VAT

For a 100 m² home: from €100,000, excluding VAT.

A starting point for a conversation, not a fixed quotation. The final cost depends on the property’s condition, materials, building services and bespoke solutions.

Our approach: a complete project

We work in the premium and luxury segment for clients seeking a cohesive interior and coordinated delivery. Low-budget cosmetic refreshes and isolated small repairs fall outside our scope.

  • Individual design and agreed materials
  • Building services, lighting and details planned before work begins
  • Detailed estimates, coordination and execution checks
Discuss your project and budget
What the budget covers

Pricing basis: construction work, services and finishes. Kitchens, bathrooms and joinery are specified from the survey and specification. Loose furniture, appliances, professional fees, permits, fees and VAT are extra. Structural work, restoration and special cases are priced separately.

Full-renovation company in Barcelona

BCN YARD, SLU is a renovation company based in Castelldefels working across Barcelona and the wider province: the city, Baix Llobregat, the Garraf with Sitges, and the Maresme. We carry out full renovations of flats and houses, luxury renovations, interior design, renovations of shops, offices, clinics and hotels, and turnkey house construction.

One team handles the site visit and measurements, design, itemised estimate, purchasing, works and handover, and one person is responsible for the project. Guide prices excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². We speak Russian and Spanish.

Frequently asked questions

How much does a full renovation in Barcelona cost per m²?

BCN YARD guide prices excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². For a 100 m² flat that means from €100,000, €200,000 and €300,000. The exact price is set in the itemised estimate after the site visit and measurements.

How long does a full flat renovation take?

A full renovation of an 80–110 m² flat usually takes 3 to 6 months on site. Add the design, the estimate and the City Council permit. The schedule is set after the site visit.

Do I need a works licence for a full renovation?

It depends on the works. In Barcelona the procedure can be an assabentat, a comunicat immediat, a comunicat diferit or a major works licence, for example when the structure is affected. You can check your case with our “Which permit do I need?” assistant.

What guarantee does a renovation carry?

Spain’s Building Act sets, from handover of the works, 1 year for workmanship defects in finishes, 3 years for defects that prevent normal use of the home and 10 years for structural defects. What our insurance covers and how payment works is on the “Guarantees and how we work” page.

Which areas do you cover?

Barcelona and the wider province: the city, Castelldefels and Baix Llobregat, the Garraf with Sitges, and the Maresme.

Can the renovation be done while I live outside Spain?

Yes. The first conversation can be a video call: you send the floor plan, photos and what you want to achieve. One person is responsible for the project, we speak Russian and Spanish and payments are staged under contract.

Luxury renovations in Barcelona

Luxury renovations in Barcelona from €1,000/m² + VAT · Premium, Luxury, Signature Luxury renovations by area

Guide topics

Before you hire · 46 Luxury renovation · 48 Permits step by step · 28 House construction · 56 Turnkey renovation · 135 Interior design · 87

BCN YARD / Contact

Let’s start with your idea.

Property type, area and your wishes. Size and dates can wait.

Privacy

Complete a detailed brief