
Terrace flooring: decking, stone or pedestal porcelain
Porcelain 20 mm thick on adjustable pedestals gives a raised floor, access to the waterproofing and a level match with the living room. Timber is warmer and softer, stone heavier and cooler. We compare heat, weight, slip resistance and upkeep.
View details



















