
Microcement: pros, cons and where not to use it
A straight look at cracks from the substrate, underfloor heating, tile joints under the coating, sealer wear and what to demand from the applicator.
View detailsBlog
BCN YARD guides: Interior design. 84 articles to help plan your project in Barcelona. Page 3.

A straight look at cracks from the substrate, underfloor heating, tile joints under the coating, sealer wear and what to demand from the applicator.
View details
What separates filled from open-pore travertine, how the cut changes the pattern and where the stone of quiet luxury works in a shower, on a floor and in a living room.
View details
How slabs from one block are chosen and reserved, how the pattern is laid out on a drawing, and why a marble wall is decided before furniture and sanitaryware.
View details
A practical look at five popular marbles and their finishes: where the stone ages well and where acids and water leave marks.
View details
What makes a small kitchen comfortable is a short fridge-sink-hob route and storage up to the ceiling, not the amount of worktop.
View details
In a small bathroom space comes from the layout and what goes inside the walls: wall-hung fixtures, a level shower, a fixed glass panel, a pocket door and niches.
View details
A living-dining room works when zones, walkways and electrics are decided together with furniture to scale, before the works begin.
View details
A main bedroom works when the bed position, clearances, bedside lighting, climate and route to the bathroom are fixed before finishes. Curtains and furniture come later.
View details
A dressing room pays off when there are 4–5 m² to spare without shrinking the bedroom. If space must be taken, a 60 cm deep wardrobe holds nearly as much.
View details
Only the part of a loft with enough headroom, a floor that takes the load and heat that insulation can control can become a real room.
View details
A duplex staircase is planned first: step sizes, the slab opening and headroom fix its place on both floors, and the material is chosen afterwards.
View details
A washing machine and drying area fit on a terrace inside a closed, ventilated technical cabinet with water and drainage, with slats hiding the washing. Start with facade rules.
View details
An entrance stops collecting clutter once every item has a place of the right depth. Dimensions and the design sequence.
View details
An island needs clear space on all four sides and drainage and extraction in the middle of the room; a peninsula fits in fewer metres.
View details
A kitchen needs three layers of light: general, task lighting over the worktop, and ambient. They are planned with the cabinet drawings, before the wiring goes in.
View details
A fitted wardrobe is designed early and measured late: the wiring goes in before plastering, the final survey after the finishes.
View details
For a remote brief the studio needs how you live, a plan and photos with unverified dimensions flagged, the budget level and clear approval rules. An on-site survey is still needed.
View details
In a small living room you settle the main function and walkways first, then pick specific pieces by their real dimensions.
View details
Each diner needs about 60 cm of table edge, and at least 80 cm between table and wall. How to turn that into a dining zone, a table shape and a light position.
View details
A home workspace is designed around how you work: hours, calls, equipment. That sets its location, lighting, acoustics, sockets and storage.
View details
A bedroom needs daylight, evening privacy and darkness for sleep: usually two layers plus persianas, with the track recess planned before the ceiling.
View details
An entrance is designed around what you do in your first minutes home: belongings, circulation and services come before decoration.
View details
In a child’s room, the renovation fixes only what is hard to change: electrics, lighting, built-in storage carcasses, flooring and sound insulation. Furniture, colour and decor stay changeable.
View details
A laundry room works when every step has its place and the machines can be serviced and replaced. Dimensions, services and common mistakes.
View details