A Bellamar villa: plot and renovation programme

The construction programme depends on access, deliveries, storage and exterior works, not just room count.

House volumes and terraces
Illustrative image; it does not identify a project in this neighbourhood.

Start at the gate and delivery route

Check how stone, windows, equipment and large furniture will arrive, where they can be stored and how waste will leave. Measure openings and lifting routes before ordering. A narrow street or difficult entrance need not stop the project, but changes sequencing and logistics costs.

Plan plot and house together

Terrace, drainage, garden and pool affect worker access, services routes and the order of finishing. Budget them separately from interiors. Before promising dates, review the property, documents and applicable rules with the architect and specialists; the programme should show decision dependencies, not just a completion date.

Tie procurement to access and phases

Do not order large items from room drawings alone. Check gate, lift or stair dimensions, unloading space, temporary storage and installation order. Then set decision dates for windows, stone, joinery and equipment, noting which work depends on each delivery. Where terraces or drainage are also changing, coordinate site routes so completed areas do not have to be disturbed for the next phase.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property