Access shapes the programme
Delivery routes, storage and waste removal are reviewed before the procurement programme. Large equipment and joinery need measurements and a feasible lifting route.
Where we work
A Bellamar villa renovation starts with the house, plot and construction access. We coordinate layout, services, exterior work, logistics and costs in one programme.

Delivery routes, storage and waste removal are reviewed before the procurement programme. Large equipment and joinery need measurements and a feasible lifting route.
Terraces, drainage, garden and pool where included receive separate cost lines. Structure and permissions are assessed by a specialist after reviewing the property.
BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.
Montemar means slopes, larger plots, views and wind, so retaining walls, terraces and awkward access. Playa means flat sandy ground, dense building, salt and noise. Foundations, facades and logistics differ as a result. The interior depends more on budget than on the neighbourhood.
Not for interior work with no structural changes. For an extra storey, basement, pool or retaining wall, almost always: by the sea the ground is sandy and the water table high, and without a report the structural engineer cannot sign off the calculation. Order it before the first sketch so the design does not have to be redone.
On the front line use AISI 316 rather than 304, since it copes better with sea salt. Aluminium frames get marine-grade powder coating and timber should be thermally modified or tropical, oiled regularly. Small things like screws and hinges are usually where false economy shows up first.
BCN YARD / Contact
Service area: Barcelona and the wider province.