BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Services

Building and activity permits in Barcelona

Barcelona building permits (assabentat, comunicat or major works) and activity permits for your premises: technician, documents, fee and 4% ICIO, coordinated with the works.

Visualization: Mediterranean interior with natural materials and warm light
Concept visualisation
01

Who it is for

For clients who need works or business-activity permits for a specific property.

02

What is included

We gather documents and coordinate the professionals and others involved. What we take on is agreed in writing.

03

How we work

First we check the property suits the activity. Then specialists set out the documents and procedures.

04

What you receive

A clear plan: the steps, who is responsible and what documents are missing.

05

Cost and timing

Procedures and timing depend on the municipality, the works, the activity and the building.

06

Getting started

Share the municipality, current and intended use, and any documents. Best to check before you buy or open.

07

Which building permit does your renovation in Barcelona need?

Barcelona's works ordinance, the ORPIMO, sets out four routes. The assabentat is a notice without a technician for interior works that do not change layout, structure or facade. The comunicat immediat covers interior re-planning, a one-off structural intervention and the facade of an unprotected building. The comunicat diferit is for works that partly affect the structure or two or more dwellings. The llicència d'obres majors is for new build, added volume, new dwellings, change of use and global structural work.

Your case is classified by the technician who signs the documents, based on what will actually be done. We settle it before the quote, because the schedule and cost of the works depend on it.

08

Activity licence or notification to open premises?

In Barcelona the activity permit is governed by the OMAIIAA, with three regimes: environmental authorisation, licence and notification. Most offices, shops and studios open with an activity notification and a technical certificate, without waiting for a licence. Many bars and restaurants, with customers and noise, need a licence: it is requested before the works, the City Council has six months to decide and you cannot open before the decision.

The first step is the prior consultation on the Oficina Virtual, ideally before signing the lease: it gives the regime, whether the premises are compatible and the documents, and its code is valid for six months. Works on the premises are processed first and separately; the activity notification is filed once the premises are finished.

09

How much does a building permit cost in Barcelona?

Two items are paid to the City Council. The planning services fee, according to the procedure page in 2026, is €51 for a minor-works notification with a technical project, €43 with technical documentation and €385 for most major-works licences. The ICIO is 4% of the material execution budget: on a renovation with €60,000 of material execution, €2,400. An activity notification also pays the 4% ICIO on the cost of the works or installations.

On top come the fees of the technician who signs the documents or the certificate. What we take on and what it costs is set out in writing in the quote. Municipal figures change: confirm them on the City Council's e-office before paying.

10

How long does it take and when can works start?

With an assabentat you only give notice before starting. With a comunicat immediat you can start once the ICIO, generated in the same procedure, is paid. With a comunicat diferit the City Council reviews the documents and the payment letter arrives with admission, within the month of review. A major-works licence takes longest: the ICIO comes with the decision and is paid before starting.

That is why the renovation schedule is planned around the procedure, not the other way round. If demolition reveals something that changes the works, such as a damaged beam, the technician assesses whether the application must be amended.

11

What do we do and what do you sign?

We check whether the property suits the works or the activity, coordinate the technician who drafts and signs the documents, gather the paperwork and fit the works schedule to the procedure. When the space is commercial premises, we handle the activity together with the works: at the 250 m² children's psychology centre in the Eixample, legalising the healthcare activity was part of the project from the start.

As owner or holder, you sign the application with your digital ID (idCAT Mòbil, Cl@ve or a certificate), pay the fee and ICIO by self-assessment and, if the works touch the facade, downpipes, light well or roof, obtain the community's consent. Outside Barcelona, in Castelldefels, Sitges or Sant Cugat, each council sets its own procedure.

Frequently asked questions

Do I need a building permit to renovate a flat in Barcelona?

Some procedure is always needed, but not always a licence. Changing floors, painting or renovating a bathroom without moving walls is an assabentat, a notice without a technician. Re-planning the flat needs a comunicat immediat with technical documents, and splitting it in two or changing its use needs a major-works licence. The signing technician sets the exact procedure.

What is the difference between an activity licence and an opening licence?

"Opening licence" is the old name for the permit that lets premises operate. Barcelona's ordinance provides for environmental authorisation, a licence or a notification depending on the activity. An ordinary office or shop almost always needs an activity notification with a technical certificate; a licence in the strict sense is for activities such as many bars and restaurants.

Can I open the premises while the permit is being processed?

With a notification, yes: the activity can start the day after the complete documents are filed with the ICIO paid, and the City Council checks afterwards. With a licence, no: you must wait for the decision, which can take up to six months.

Who files the permit, you or me?

The application is signed by the owner or the activity holder, or their representative, and the technical documents by a competent technician. We prepare the file with the technician and coordinate the procedure with the works; if you work with a gestor, they can file it.

Related services

From property to opening

Guides for planning your project

Building permits in Barcelona: a guide to what your renovation needs Choosing a plot for your new house Opening an office or shop in Barcelona: filing the activity notice yourself Cèdula d'habitabilitat: how to apply yourself, step by step Comunicat diferit in Barcelona: what the technician does and what you do Old plans and building permits from Barcelona's Municipal Archive: how to request them ITE in Barcelona: how to order the building inspection and get the certificat d'aptitud Asbestos in a renovation: how to check, who may remove it and what paperwork applies All guides: Permits step by step

Which permit do I need for my works in Barcelona?

Check which permit your works need

Information needed to identify the procedure

Prepare the exact address, current and intended use, available plans and a description of the works. Flag proposed changes to structure, façades, floor area, services or common elements for the relevant professional to assess.

The procedure must be checked for the specific property and municipality. Barcelona’s municipal preliminary consultation identifies the procedure and its documentation. Before appointing anyone, define who prepares, signs and submits each document and which fees and charges are separate. Coordinating documents does not guarantee an administrative decision.

Who signs technical documents

How to check the works procedure

Prepare premises for the activity

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property