BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Where we work

Luxury renovations in Castelldefels

High-end residential projects in Castelldefels, coordinated by one team from design and survey to handover.

01

House, plot and setting

We review the envelope, roof, services, exterior works, pool and access before fixing the scope.

02

Integrated comfort

Climate, lighting, sound, storage and joinery are integrated without dominating the interior.

03

One coordination layer

We sequence decisions, procurement, trades and checks with one lead for the owner.

Related services

Luxury and high-end renovations A shopfront in a ground-floor unit of a historic building A premium beauty salon: water, ventilation and durable design A pilates studio and boutique gym: noise, vibration and ventilation An art gallery and showroom: museum lighting, walls and storage A premium aesthetic and dental clinic: design and technical requirements

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

Enquiry delivery is not connected yet. You can complete and download a summary; it will not be sent to the company.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property