
Carrer d’Urgell, Eixample, Barcelona · 109,80 m²
Urgel · apartment renovation
Full home renovation · new layout, services, bespoke joinery, two bathrooms, open kitchen and finishes
View the project and photographsServices
Apartment and house renovation in Barcelona and the wider province. Design, itemised estimates and work coordination with an agreed scope.





Full renovation of a 109.80 m² flat in the Eixample: four bedrooms, living-dining room with open kitchen, two bathrooms and a terrace. Herringbone flooring, slatted wood panelling, marble feature wall and recessed linear lighting.




Full renovation of a terraced house with sea views on the Garraf coast: kitchen, bathrooms, living room, finished basement, timber-decked terraces, a glazed porch with an awning and the garden.
For owners and buyers reshaping an apartment or house around how they live. We look at the layout, the services and your daily routine. Before choosing finishes, we work out what can stay and what needs opening up and checking. If the structure is involved, an engineer assesses it.
Strip-out, building work, services, kitchens, bathrooms, joinery and finishes. The contract states which works, supplies, furniture and paperwork are in the price and what is quoted separately.
Survey, layout and materials, an itemised estimate and work sequence. Materials are ordered only once you have decided. Timing depends on design, supplies and permits. If anything slips, you hear about it early. Extra work is priced before it is done.
A finished home, checked finishes and documentation of the work done.
Condition, area, layout changes, systems, materials and access affect the estimate. Scheduling is developed after the visit.
Share the area, your needs and any plans or photos you have. An existing design is not required.
A full renovation in Barcelona means working on the layout, the water, electrical and climate services, and all the home’s finishes, coordinated as a single project rather than separate room-by-room interventions. BCN YARD carries out this type of renovation with one responsible team from start to finish, from the initial measurement to handover, across Barcelona and its province.
The process starts with a visit and measurement of the property, continues with a layout and services project, and moves on to a quote itemised by line before any work begins. This order, not the reverse, is what allows the final price to match what was quoted, barring technical surprises that are justified and communicated in writing.
The Urgel project, a full 109.80 m² renovation in Barcelona’s Eixample, illustrates this complete process: four bedrooms, an open kitchen, two bathrooms and a terrace, renovated as a single coordinated project. You can see the result with real photographs on this site’s projects page before requesting information about your own.
BCN YARD guide prices excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². Renovating an 80 m² flat in Barcelona therefore costs from €80,000 at Premium, from €160,000 at Luxury and from €240,000 at Signature.
The final estimate depends on the condition of the property, layout changes, the services to be replaced, materials and access to the building. That is why we itemise it after the site visit and measurements; for a first estimate you can use our flat renovation calculator.
A full renovation of a flat or house brings into one project what a partial renovation would do piece by piece: strip-out, a new layout with brick or plasterboard partitions, new electrics and plumbing, heating and cooling, screeds and floors, walls and ceilings, interior joinery, kitchen, bathrooms and painting.
The kitchen and bathrooms weigh most in the estimate: waterproofing, drainage, tiling and bespoke units. That is why we plan them together with the layout, before choosing tiles. The contract states which works, supplies, furniture and paperwork are in the price and what is quoted separately.
Compare itemised estimates, not totals: two estimates for the same amount can cover very different work. Ask to see finished projects with real photos, and ask who is responsible for the site day to day and how extra work gets approved.
At BCN YARD the estimate is itemised after the site visit and measurements, one person is responsible for the project from start to finish, and extra work is priced in writing before it is done. This page shows two completed full renovations: a 109.80 m² flat on Carrer d’Urgell in the Eixample and a house on the Garraf coast.
BCN YARD guide prices excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². For a 100 m² flat that means from €100,000, €200,000 and €300,000. The exact price is set in the itemised estimate after the site visit and measurements.
A full renovation of an 80–110 m² flat usually takes 3 to 6 months on site. Add the design, the estimate and the City Council permit. The schedule is set after the site visit.
It depends on the works. In Barcelona the procedure can be an assabentat, a comunicat immediat, a comunicat diferit or a major works licence, for example when the structure is affected. You can check your case with our “Which permit do I need?” assistant.
Spain’s Building Act sets, from handover of the works, 1 year for workmanship defects in finishes, 3 years for defects that prevent normal use of the home and 10 years for structural defects. What our insurance covers and how payment works is on the “Guarantees and how we work” page.
Yes. The first conversation can be a video call: you send the floor plan, photos and what you want to achieve. One person is responsible for the project, we speak Russian and Spanish and payments are staged under contract.
Our own crew and trusted subcontractors. One person is responsible for the project from start to finish, and we reply to enquiries within an hour.
Agree the layout, the kitchen and bathroom positions, the services to replace and the finishes to retain. The renovation project should identify materials that are already selected and allowances that still need a decision. Check access to the building, deliveries and the work sequence with the contractor. Keep the agreed scope and exclusions with the itemised estimate, and approve extra work in writing before it is carried out.
For an initial review, share the address or area, approximate floor area, whether the home will remain occupied and the rooms you want to change. A plan and photographs of the kitchen, bathrooms and services help distinguish what can stay from what needs inspection.
Compare quotes against the same scope: strip-out, services, finishes, supplies, waste, professional fees and permits. Included items, exclusions and open decisions should be identified; a calculator estimate does not replace an itemised quote.
BCN YARD / Contact
Service area: Barcelona and the wider province.