Assess
We review the plot and your goals. What can be built, and how, is checked with architects and engineers.
Barcelona and the wider province
We build houses and run the whole project in Barcelona and the wider province, from the first plot assessment to finished interiors and handover.

01 / A considered approach to every space.
Structure and envelope, building services, finishes and interiors. Terraces, a pool and landscaping if you want them. The exact scope is fixed in the design and contract.
We build with our own crew, with vetted subcontractors for specialist trades. One person is responsible for your house, and that is who you deal with.
We review the plot and your goals. What can be built, and how, is checked with architects and engineers.
We run the design, technical documents and interiors. Scope, materials, budget and programme are fixed before building starts.
We run the build and the specialists it needs. We track progress, costs and decisions; changes are always agreed in writing.
We check the finished work, fix any snags and gather the documents for handover.
BCN YARD project · House with a pool
Photographs from our archive: construction stages and completed spaces from the same project.
Investment depends on the plot, floor area, structure, services, finishes, access and outdoor works. We price item by item from the information available, with assumptions and exclusions in plain view. The renovation prices on this site do not apply to building a house.
Request an estimateTo begin, share the plot location, any documents and what you want from your new home.
Not necessarily. We start from your needs and any plot documents you have, and map out the next steps. Before settling on a solution, we check it is feasible.
We run the whole house, from design decisions through construction and handover. What is included is in the contract, with equipment, outdoor works and paperwork listed item by item.
Yes, we cover Barcelona and the wider province. Before proposing a plan and programme, we look at the plot’s location, access and conditions.
It depends on the design, the plot, supplies and permits. Without a defined scope we won’t quote a fixed price or timeline; for a first figure there is our construction calculator and our guide to house-building budgets in Barcelona.
It depends on the plot, the design and the timeline. The building system is chosen with the architect and engineers before pricing. Our guide to luxury prefabricated and modular houses in Catalonia explains what they can and cannot do.
A major works licence from the town council, with a project signed by an architect. On completion, the final works certificate and the habitability certificate. Before buying a plot, check what local planning allows.
Yes. The first meeting can be a video call with the plot details, we speak Russian and Spanish, and one person is responsible for the house from start to finish.
Our liability insurance (Hiscox) covers interior renovation without structural elements. Structural work, new construction and rehabilitation are carried out by specialist subcontractors, with BCN YARD coordinating the whole job. Guarantee periods follow the LOE: 10 years structure, 3 years habitability, 1 year finishes.
Guarantees and how we workShare the location or cadastral reference, available planning information, survey and design if these already exist. Include access, known utilities, required rooms and plans for a pool, garden or parking. Missing documents are identified before a proposal is finalised.
Distinguish the building from external works and associated services: foundations, structure, services and finishes; pool, retaining walls, drainage and garden; design, surveys and procedures. Contracted scope and professional involvement are defined for each plot. Photographs of another house do not establish feasibility or cost for yours.
View the house and pool archive
BCN YARD / Contact
Service area: Barcelona and the wider province.