BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Services

Building rehabilitation in Barcelona

For owners, residents’ associations and investors restoring or adapting an existing building. The underlying problems are identified first.

Visualization: contemporary stone villa beside a Mediterranean garden
Concept visualisation
01

Who it is for

For owners, residents’ associations and investors restoring or adapting an existing building. The underlying problems are identified first.

02

What is included

Façades, roofs, common areas and building elements, following the survey and design.

03

How we work

Specialists carry out the technical survey. From their findings we set priorities, access, protection and phasing.

04

What you receive

Documented work, an issues list and a full check before handover.

05

Cost and timing

Costs depend on defects, access, building occupancy and any heritage constraints.

06

Getting started

Provide existing reports, photographs of affected areas and the owner’s priorities.

Related services

From property to opening

Guarantee and insurance

Our liability insurance (Hiscox) covers interior renovation without structural elements. Structural work, new construction and rehabilitation are carried out by specialist subcontractors, with BCN YARD coordinating the whole job. Guarantee periods follow the LOE: 10 years structure, 3 years habitability, 1 year finishes.

Guarantees and how we work

Guides for planning your project

Following the structural stage as a homeowner What to retain and replace in a renovation Building refurbishment in Barcelona Renovating a 1970s-80s coastal villa: what almost always changes Major-works licence: when your renovation needs one ITE: what the Technical Building Inspection is and when it affects your renovation Renovating in a listed or protected building: what changes New services in an old building: risers, supplies and shared drains All guides: Turnkey renovation

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property