BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Services

Renovation estimates in Barcelona

Itemised renovation estimates in Barcelona with quantities, materials, exclusions and taxes. Define the scope and compare proposals.

Visualization: travertine, walnut and bronze interior detail
Concept visualisation
01

Who it is for

For owners and investors who want to know what they are paying for and where the budget goes.

02

What is included

Work items, quantities, chosen materials, exclusions and taxes, each on its own line.

03

How we work

We work from measurements and design, flag open items and combine every trade’s figures.

04

What you receive

An itemised proposal and work sequence to compare options and approve changes knowing the cost.

05

Cost and timing

Turnaround depends on design detail and available information. We don’t use generic per-square-metre prices.

06

Getting started

Share plans, quantities and preferences. If unavailable, we start with a visit and scope definition.

07

How much does a full renovation in Barcelona cost in 2026?

BCN YARD has three guide prices excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². Renovating a 60 m² flat costs from €60,000, €120,000 and €180,000; a 90 m² flat, from €90,000, €180,000 and €270,000.

This is a starting point, not a fixed price. The total cost of renovating your home comes from the itemised estimate, which we prepare after the site visit and measurements. For a first figure you can use our budget calculators.

08

What does an itemised renovation estimate include?

An itemised estimate splits the works into chapters, each with quantities, unit prices and what is included: strip-out and waste management, building work and partitions, plumbing, electrics, heating and cooling, interior joinery and doors, kitchen, bathrooms, wall finishes, floors and painting. Listed separately are the supplies you choose, furniture, professional fees and Barcelona City Council procedures.

Materials not yet chosen are priced as provisional sums with a reference amount, and extra work is priced in writing before it is done. That way the final price matches the estimate, except for justified technical surprises reported in writing.

09

What affects the price of a renovation?

The biggest factors are the condition of the home and its services, the floor area, how much the layout changes, the quality of materials and finishes, the kitchen and bathrooms, and access to the building. A 1960s Eixample flat with original services is not priced like one renovated a few years ago.

Permits also count: the municipal procedure, the fee and the ICIO construction tax, which in Barcelona is 4% of the material execution budget. And timing: choosing materials before work starts avoids mid-project changes, which are what make a renovation more expensive.

Frequently asked questions

How much does it cost to renovate a 60 m² flat in Barcelona?

At BCN YARD guide prices excluding VAT, from €60,000 at Premium, from €120,000 at Luxury and from €180,000 at Signature. The exact figure comes from the itemised estimate after we see the flat.

Is the estimate a fixed price?

The estimate is signed item by item, with quantities and unit prices. Extra work is priced in writing before it is done, and technical surprises are justified and reported in writing before we continue.

How do I compare renovation estimates?

Give every company the same scope and compare item by item, not the total: which strip-out, services and finishes each one includes, which materials are provisional and what is left out, such as furniture, fees or permits.

Which taxes and municipal fees should I add?

VAT on the works and, where a notice or licence is needed, the planning fee and the ICIO tax, which in Barcelona is 4% of the material execution cost under the 2026 tax bylaw. Our guide to the fee and ICIO explains it.

How is a kitchen estimate put together?

Item by item: strip-out, water, drainage and electrics, levelling walls and floor, wall and floor finishes, kitchen units, worktop, appliances and fitting. Units and worktop vary the most, so they are priced on the chosen model.

Related services

From property to opening

Guides for planning your project

Budget for building a house in Barcelona Comparing renovation quotes beyond the total Why to be wary of a contractor who only accepts cash Staged payments in a renovation: how to tie them to actual progress How to finance a renovation: common options Renovation budget for a 200 m² apartment in Barcelona's upper districts Spanish-Russian renovation glossary: 40 terms from quotes and contracts Three stages of a renovation quote: indicative, preliminary and final All guides: Before you hire

Budget calculators

Apartment renovation

Compare quotes for the same scope

To compare two quotes, align quantities, units, material specifications and preparation and finishing work. Check waste, transport, access equipment, fees and permits too. An undefined item should be marked as open, rather than mistaken for included work.

Separate the works amount from taxes, supplies and services procured elsewhere. When an option changes, keep the previous version and agree the effect on price and programme in writing before proceeding.

What makes up a renovation budget

Payments and verifiable progress

Initial calculator estimate

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property