
Carrer d’Urgell, Eixample, Barcelona · 109,80 m²
Urgel · apartment renovation
Full home renovation · new layout, services, bespoke joinery, two bathrooms, open kitchen and finishes
View the project and photographsServices
Interior design studio in Barcelona and the wider province. Layouts, materials, lighting and digital visualisation connected to budget and delivery.





Full renovation of a 109.80 m² flat in the Eixample: four bedrooms, living-dining room with open kitchen, two bathrooms and a terrace. Herringbone flooring, slatted wood panelling, marble feature wall and recessed linear lighting.




Full renovation of a terraced house with sea views on the Garraf coast: kitchen, bathrooms, living room, finished basement, timber-decked terraces, a glazed porch with an awning and the garden.




Full fit-out of 250 m² premises in Barcelona’s Eixample for a children’s psychology centre, delivered in five months: consulting rooms, therapy rooms, reception, three washrooms and a kitchen, with new services and healthcare-activity licensing.
For owners who want a distinctive interior and a clear plan before building work begins. We start with daily life: movement, storage, working from home, daylight and connections between rooms. We study what can be retained and what should change; trends inspire, but the proposal grows from the property and your priorities.
Site visit and measurements, a detailed brief, layout options, concept, material palette, lighting scenes, bespoke joinery and visualisations, assembled to suit your project. We prepare drawings and specifications. We compare real samples and check everything against the budget. Furnishing and purchasing are included when listed in the proposal.
We move in stages: brief and layout, then materials, light and details, and finally construction drawings. Digital tools let us compare options and keep everyone on the latest version. Changes affecting scope, materials or budget are recorded and agreed with you first. Technical matters are settled with the project’s technical lead.
A coherent set of decisions: approved layout, chosen finishes, lighting, drawings and specifications. Visuals help you decide; construction drawings define what gets built.
The number of spaces, options, detail and technical coordination affect scope. The proposal states how many revisions are included.
Tell us how you want to use the space, your priorities and style references. Include plans if available.
At BCN YARD, interior design is not addressed after defining services and layout, but together with them, because the position of a light point or a socket depends directly on design decisions such as furniture placement or each room’s intended use. This joint process avoids discovering incompatibilities once the works are closed off.
Material, colour and finish decisions are approved on physical samples, not only renders or digital catalogues, because a material’s real behaviour under your specific home’s light can differ from what a screen shows. This step, described in more detail in our guide on materials before renovation, is a normal part of the design process.
If you are looking for an interior design project in Barcelona, either alongside a renovation or for a home that already works well technically, share your references and priorities so we can prepare an initial design proposal.
In a Luxury or Signature renovation the interior design is not a picture but documentation: layout, lighting, bespoke joinery, materials and details that the estimate is then priced from and the works are built to. For us design and construction are one process, so decisions from the design are not lost on site.
We design interiors for flats, houses and villas in Barcelona and the wider province, as well as shops, offices and clinics. A luxury interior design project sets the layout, the choice of materials and furniture, the lighting and the bespoke joinery; the same team prices the estimate and carries out the works.
Many people look for an interior designer or a decorator; a renovation needs more than that. Interior decoration chooses furniture, textiles, colour and decorative lighting. Interior architecture also changes the layout, services and bespoke joinery. Our interior design covers both and carries through to the works: construction drawings, an itemised estimate and one person responsible for building what was approved.
We also do commercial interior design for shops, offices and clinics. In the fit-out of 250 m² premises in the Eixample for a children’s psychology centre we delivered the new layout, heat-recovery climate control, acoustic panels and 24 concealed-frame doors.
Site visit and measurements, a detailed brief, layout options, concept, materials palette, lighting scenes, bespoke furniture and visualisations, plus plans and specifications. The set is tailored to each project; furnishing and purchasing if they are in the proposal.
Every decision is checked against the estimate during design: we compare real samples, and changes that affect scope, materials or budget are recorded and agreed with you in advance. The works follow the construction drawings; visualisation helps you decide.
Technical questions are resolved with the project’s architect or engineer.
It depends on the number of rooms, the options, the level of detail and the technical part. How many revisions are included is stated in the proposal.
Yes. Design and construction are one process for us. The project lead runs everyone involved and answers to you for the project. Specialist technical tasks go to qualified professionals.
We work in Barcelona and the wider province: the city, Castelldefels and Baix Llobregat, the Garraf with Sitges, and the Maresme.
Yes. The interior design includes visualisations and a materials palette with physical samples that you approve before anything is ordered. The works then follow the construction drawings.
Yes. The first meeting can be a video call with plans and photos. We speak Russian and Spanish, and one person is responsible for both the design and the works.
STUDIO / DESIGN + DELIVERY
An exceptional interior begins long before finishes are chosen. We study how the space will be lived in, explore light and proportion, and turn decisions into information that can be priced and built.
We follow developments in interiors, materials and lighting. Trends are a reference, never a replacement for judgement: the result must suit the property, its occupants and the passage of time.
A visit, measurements and a needs brief. We review the property's condition and the constraints shaping the proposal.
Layout options, material references, lighting and digital visualisation if you want it. You compare options before work starts.
Drawings, specifications and details. Every choice is checked against the budget; technical points go to the architect or engineer.
Current document versions, a change log and progress photos keep you and the crew working from the same decisions.
Digital tools hold our measurements, visualisations, current documents, progress and changes. What you receive and how often we report is agreed per project. Technology helps us decide and control, but it never replaces a site visit or measuring on site.
Prepare a plan, photographs, references and priorities for storage, lighting, circulation and features you want to retain. Identify decisions already made and those still open.
When comparing proposals, check deliverables, included revisions and whether surveying, services drawings, purchasing and technical coordination are included. A reference image guides design; approved dimensions and specifications make it possible to price and build it.
BCN YARD / Contact
Service area: Barcelona and the wider province.