BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Where we work

Luxury house and apartment renovation in Sarrià

In Sarrià, a home's value often lies in its proportions and details. We preserve what gives it character while planning a contemporary layout, services and family comfort.

Timber wall cladding beside the bathroom entrance
Illustrative image; it does not identify a project in this neighbourhood.
01

Start with an inventory

We review stairs, doors, floors, windows and the connection to the garden. Decisions on restoration, adaptation or replacement come before demolition. Structure and any heritage status require separate checks.

02

Comfort without erasing character

We coordinate lighting, climate, storage and family routes. The estimate distinguishes technical works from finishes; programme and access reflect the building and neighbours.

03

How much does a luxury renovation cost in Sarrià?

BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.

Frequently asked questions

Do you need the neighbours' consent to renovate a terraced house?

For work inside your own house the neighbours' consent is normally not required. But any intervention in the shared wall, whether a load, an opening or a raise, touches their rights and is agreed beforehand. Neighbours are warned in person about noisy phases. Complex cases involving the party wall are best shown to a lawyer.

Should you have the structure inspected before buying such a house?

Yes. An engineer's or architect's inspection shows the condition of floors, beams, vaults and shared walls, damp and cracks, and so the likely scope of work. It costs far less than a surprise at opening-up. Get the result before signing the purchase contract and before the estimate.

How much does it cost to renovate a house of this type?

Our guide: Premium from 1,000 €/m², Luxury from 2,000 €/m², Signature from 3,000 €/m², excluding VAT. We give the exact price in the estimate after a visit and measurements. In a terraced house it depends on the condition of the party wall and floors, the staircase, soundproofing and the logistics of a narrow street.

Related services

Luxury and high-end renovations A Sarrià house: preserving character through renovation Renovating a terraced townhouse in Sarrià or Gràcia: three floors, courtyard and party wall

Other areas

Luxury renovations in central Barcelona Luxury renovations in Castelldefels Luxury renovations in Gavà and Gavà Mar Luxury renovations in Maresme Luxury renovations in Sitges Luxury villa and apartment renovation in Pedralbes Luxury apartment renovation in Les Tres Torres Luxury renovation in Galvany and around Turó Park Luxury house renovation in la Bonanova Luxury renovation in Dreta de l’Eixample Luxury apartment renovation in Diagonal Mar Luxury villa renovation in Gavà Mar Luxury villa renovation in Bellamar, Castelldefels

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property