Views and comfort
We study overheating, glare, sun movement and evening privacy before selecting glazing, shading and light. Facade interventions depend on building rules.
Where we work
Panoramic views call for precise decisions on sun, privacy, climate and terrace. We plan the apartment for daily life, not one photograph of the sea.

We study overheating, glare, sun movement and evening privacy before selecting glazing, shading and light. Facade interventions depend on building rules.
We choose exterior materials and furniture with exposure and maintenance in mind. We review drainage and equipment access; structural loads require calculation.
BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.
For work inside the apartment a vote of the owners' meeting is normally not needed, but the law requires you to notify the community's representative beforehand. A vote is needed if the work touches the facade, glazing, risers, shafts or structure. In practice the administrator asks for a schedule, contractor details and insurance, so send them together in one letter before work begins.
Our guide for the Signature level is from 3,000 €/m² excluding VAT, with the exact price given in the estimate after a visit and measurements. In a tower logistics adds to it: lift booking, hoisting large pieces, protecting common areas. Glazing and climate control are approved separately, and their cost depends on what the community decides.
It depends on the statutes and the community's decision. In many tall buildings the spot for the outdoor unit is fixed in advance, and units on the facade or on balconies visible from outside are not allowed. If there is no space, a ducted system with the condenser in a technical area is considered. Ask the administrator before choosing the equipment, not after buying it.
BCN YARD / Contact
Service area: Barcelona and the wider province.