Light and plan depth
We plan principal and internal rooms together with ventilation and lighting. Any move of wet rooms is checked against risers and building rules.
Where we work
High ceilings and historic details do not solve a deep floor plan or ageing services. We preserve character while finding light, comfort and modern systems without indiscriminate demolition.

We plan principal and internal rooms together with ventilation and lighting. Any move of wet rooms is checked against risers and building rules.
We document doors, mouldings, floors and windows before work. Any heritage protection is checked before design; preservation is not silently replaced with imitation.
BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.
The time depends on the type of works: finishes go through an assabentat, a layout change or a localised or partial structural reinforcement through a comunicat with a technician, and a licence with a design is kept for work on the whole building's structure, added floor area or the facade of a listed building. In listed buildings the process is longer because of extra approvals. Exact times are set by the Ajuntament, and we build them into the programme from the start.
Sometimes, if it does not touch protected elements or the load-bearing structure and the community and the Ajuntament agree. Combining two flats changes the number of dwellings and needs a design and a change in the register. Check feasibility before buying the second flat.
Yes, but noise and dust must stay within the schedule agreed with the community. Warn residents in advance, protect common areas and remove waste on a timetable. The noisiest operations, such as demolition and chasing, are planned for weekday mornings and announced to neighbours and the administrator the day before.