BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

A Sarrià house: preserving character through renovation

Inventory valuable details, plan services before finishes and check layout changes to protect the house's character.

Timber wall cladding beside the bathroom entrance
Illustrative image; it does not identify a project in this neighbourhood.

Identify what deserves to stay

Photograph and record the stairs, doors, floors, openings and room proportions before demolition. Not everything must remain: identify what defines the home and what can change. A new opening or moved staircase calls for structural assessment first.

Fit services into the architecture

Ventilation, cooling, water and wiring affect ceilings and fitted furniture. Coordinate them with the layout before approving finishes. Include delivery routes for large pieces, working hours and community rules: an attractive design must also be buildable.

How to decide which original details to retain

Assess each feature for condition, architectural role and ease of adaptation. A well-proportioned door may be restored, but its geometry should be checked before ordering new joinery; an old floor may need work to its substrate. Discuss with the designer where an original detail can coexist with new services and where retaining it would create a lasting problem. Record these choices before demolition so they are not lost during construction.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property