Begin with the house logic
We map private and shared zones, stairs and exterior connections. We review the envelope and existing systems; structural changes are not assumed feasible without technical assessment.
Where we work
A house is shaped by rooms and by movement between floors, terrace and garden. The project coordinates these relationships with roof, climate, water and finishes.

We map private and shared zones, stairs and exterior connections. We review the envelope and existing systems; structural changes are not assumed feasible without technical assessment.
Exterior surfaces, lighting, drainage and a pool where relevant are budgeted separately from interiors. This makes the actual scope visible.
BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.
BCN YARD / Contact
Service area: Barcelona and the wider province.