Family routes
We map routes from entrance to kitchen, bedrooms and terrace, as well as guest circulation and everyday maintenance. This reveals wasted corridors and privacy gaps.
Where we work
A large apartment needs a sharper plan for daily life, not simply more decoration. We design shared and private zones, storage, light and services as one system.

We map routes from entrance to kitchen, bedrooms and terrace, as well as guest circulation and everyday maintenance. This reveals wasted corridors and privacy gaps.
We check electrical, water and air-distribution capacity before selecting premium finishes. Scope and changes are recorded by work package.
BCN YARD guide prices excluding VAT are the same across Barcelona and the wider province: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². The final price is set in an itemised estimate after the site visit; it depends on the state of the services, the floor area, layout changes and, for houses, the facade, roof, garden or pool.
The price depends on the size of the house and the scope: a visual survey is cheaper, trial openings and lab tests cost more. We advise doing it before signing the arras, so you know the renovation estimate and can negotiate the price. We give the exact cost after a visit.
Yes, if you change structure, volume or facade, or add a floor: a design signed by an architect and a licence are needed. For cosmetic work and replacing services without touching the structure, a technical project or a notification sometimes suffices. What is needed depends on the type of works.
Yes, and it is often better than replacing them. Timber floors are sanded and sealed, tile is restored, doors are recovered and adapted to current insulation. Original details give the house character, and in protected buildings they must be kept. Restoration costs more, but the result has more life than a replacement.
BCN YARD / Contact
Service area: Barcelona and the wider province.