BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

How to bring light into a deep Dreta de l’Eixample apartment

Map windows, structure and ventilation before planning layout and lighting. Demolition without investigation will not solve a deep plan.

Timber wall cladding beside the bathroom entrance
Illustrative image; it does not identify a project in this neighbourhood.

Map the daylight

Mark window orientation, room depth, internal courtyards and where daylight falls away. Place frequently occupied rooms nearer the better light and utility functions where daylight matters less. This is not a universal rule: check it against ventilation and actual measurements.

Keep what gives the apartment character

Record doors, mouldings, floors and openings before demolition. A new lighting plan can combine retained details, reflective surfaces and layered artificial light, but moving walls or wet rooms depends on structure, risers and building rules. Verify these constraints before visualisation.

Improve light without erasing the historic plan

Not every long corridor needs removing. Sometimes it preserves the logic of principal rooms, while a changed room use, translucent partition or layered artificial lighting solves the problem. Compare alternatives with real furniture dimensions and window positions. List features to keep; assess structure and any heritage controls separately before proposing demolition. Better light should not mean losing what makes the apartment valuable.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property