What to do if your renovation budget spirals mid-project
When the budget grows mid-renovation, first split the overrun by cause, then decide what to pay for, what to simplify and what to postpone.
View detailsBlog
BCN YARD guides: Before you hire. 45 articles to help plan your project in Barcelona. Page 2.

When the budget grows mid-renovation, first split the overrun by cause, then decide what to pay for, what to simplify and what to postpone.
View details
Save on what is easy to replace later and on late changes. Cutting corners on concealed services, waterproofing and substrates ends up costing the most.
View details
A partial renovation costs less in total but more per metre, and two partial jobs in a row almost always cost more than one full renovation.
View details
A renovation price is materials, labour and site organisation, in a different balance for each item. That decides where you can safely save.
View details
Renovations are funded with savings, a personal loan, a mortgage or public grants. How to work out the real amount, which documents the bank needs and where people usually go wrong.
View details
A first renovation figure takes a minute: floor area times the tier rate. Which area to use, how to pick a tier, and why the final quote then differs.
View details
The procedure depends on whether the works touch structure, facade, layout or common elements; the architect classifies it and the council confirms.
View details
The comunicat immediat is the route for type II minor works in Barcelona: changing a flat's layout, a localised structural intervention or the facade of an unprotected building. It needs a technician, and work can start the day after filing and paying. Where its limit lies and how not to cross it mid-job.
View details
The comunicat diferit sits between the immediate notice and a full licence: technical documents are filed first, and work starts only once the review period ends.
View details
Major works apply when the work covers the whole building’s structure, adds volume or creates new dwellings, and they reshape the team, the budget and the order of works.
View details
Works become major when they involve the whole building’s structure, add volume or floor area, create dwellings, change the main use or touch the façade of a protected building. How to check your case before getting a quote.
View details
Unpermitted works do not go away: they surface through a neighbour complaint, a sale or an insurance claim, and the owner is liable. The risks and what to do.
View details
The ITE shows the state of the building's shared elements and the comunidad's plans. Read it before buying and before setting the programme.
View details
The cédula is required to sell, let and connect utilities. A renovation that changes the layout is checked against it before the design is approved.
View details
Opening a business in refurbished premises needs a works permit and legalisation of the activity, and a clinic usually needs health authorisation as well. The activity regime sets the fit-out requirements, so check it before leasing.
View details
An interior renovation usually needs only notice; anything touching the facade, stacks or load-bearing walls needs a meeting resolution. Where the line is and how long it takes.
View details
With an immediate notice work starts almost at once; major works can take months. Build the schedule on the actual procedure, not on a generic figure.
View details
Who signs depends on the type of work: architect, arquitecto técnico, engineer or licensed installer. What each one answers for and how to check they are entitled to sign.
View details
The council asks for three groups: who and where, what is being done (description, drawings, budget, project) and supporting papers (community, waste, fees). It publishes the exact list.
View details
In a listed building, what changes is what you can touch: façade, windows and protected elements need more design work and approval.
View details
What to ask your contractor about permits at the first meeting, before signing and before starting, and which answers should set off alarms.
View details