Checklist: which permits to check before signing your renovation contract

What to ask your contractor about permits at the first meeting, before signing and before starting, and which answers should set off alarms.

Façade · completed work · house with a pool
BCN YARD project · House with a pool

Which permits should you check before signing and before work starts?

Before you sign the contract, the contractor should be able to answer three questions: which procedure your renovation needs, who files it and pays for it, and whether the consent of the comunidad de propietarios or the building's protection status comes into play. Before work starts, you should have a copy of the documents filed and, if the procedure requires a council decision, the decision itself.

The rest of this checklist unpacks those two points. How to work out the category of works is covered in our article on minor versus major works, and the procedures themselves in the Barcelona permits guide. Here you only get the questions to put to your contractor, in a convenient order.

What should you ask a contractor about permits at the first meeting?

Which procedure do you think my renovation needs: assabentat (works notice), immediate notification, deferred notification or a major-works licence? Why that one? A good answer refers to specific works: "you are moving the bathroom onto a different riser", "this wall could be load-bearing, it needs checking".

Have you seen the building's original drawings, or do you plan to open inspection holes? How will the renovation affect the cédula de habitabilidad if the floor area or number of rooms changes? A contractor who has not thought about the administrative side at the first meeting probably will not think about it later either, and the issue will surface once work is under way.

Who signs the technical documents, and who pays for the paperwork?

If the procedure requires technical documentation or a design, ask who signs it, what their qualification is (architect, arquitecto técnico or engineer, depending on the works) and whether they are authorised to sign that particular type of work. The technician's name, or at least their role, should appear in the contract.

Then the money. Are the technician's fees, processing and municipal charges included in the quote or billed separately? Who pays the construction tax? Amounts depend on the municipality and scope and are confirmed with the council or a gestor, but the answer to "who pays" belongs in the contract, not in a verbal agreement.

When is comunidad consent needed, and what changes if the building is protected?

Is the consent of the comunidad de propietarios needed? Usually yes, if the work touches shared elements: the façade, risers, shafts, the roof, the courtyard, outdoor air-conditioning units. Who requests it and how long will it take? In Barcelona an owners' meeting is not always called quickly, and that can push back the start date. Even when consent is not required, the building administrator should be told the works dates, especially the noisy ones.

Is the building protected or listed? In central Barcelona, particularly the Eixample and Ciutat Vella, many are, and protection can extend to specific interior elements, not just the façade. What is protected and what that means is confirmed with the council before the design.

What paperwork should you have before work begins?

Has the procedure been filed, and do I have a copy with the registration number? If the procedure requires a council decision, has it been issued? Is a separate permit needed for a skip, rubble bags or scaffolding on the street? Occupying the pavement is processed separately, and without it a fine can arrive before strip-out is finished.

Keep the documents yourself, not only with the contractor. You will need them when selling the flat, for the habitability certificate, and if the council or the neighbours raise a question years later. Starting work that needs a council answer before you have one is a risk you avoid simply by asking before the start.

Which contractor answers about permits should set off alarms?

"You don't need a permit, everyone does it this way." "We'll sort it out when we finish." "That's your job, we just build." "With a permit it's slower and dearer, let's skip it." Each of these means the risk stays with you as the owner: work done without the required procedure can lead to a stop order, a fine and an obligation to put everything back. The consequences are covered in our article on renovating without a permit.

A normal answer sounds different: which procedure, why, who files it, how long it usually takes and what is confirmed with the council. BCN YARD goes through these points with every client before work begins and states the expected procedure in the initial proposal. We handle the filing in Spanish and explain it to the client in Russian if that is easier.

Frequently asked questions

What should a contractor clarify about permits before you sign a renovation contract?

Before you sign a renovation contract, the contractor should answer three questions: which procedure your works need (assabentat, immediate notice, deferred notice or a major works licence), who files and pays for it, and whether consent from the comunidad de propietarios or the building's protected status must be considered. The answers should be written into the contract.

When does a renovation need consent from the comunidad de propietarios?

Consent from the comunidad de propietarios is usually needed when a renovation touches shared elements: the façade, risers, service shafts, roof, courtyard or outdoor air-conditioning units. In Barcelona the owners' meeting is not always called quickly, which can delay the start. Even if consent is not needed, tell the building administrator the work dates, especially for noisy work.

Which contractor answers about the licence are a warning sign?

Warning signs include lines such as 'you don't need a permit, everyone does it', 'we'll sort it out when we finish', 'that's your job, we just build' or 'with a permit it's dearer and slower, let's skip it'. Each one leaves the risk with you as owner: works without the right procedure can lead to a stop order, a fine and an order to put everything back.

Do you need a separate permit for a skip or scaffolding on the street?

Yes: occupying the pavement with a skip, rubble bags or scaffolding is arranged separately from the works permit, and without it a fine can arrive before demolition is even finished. Before starting, also check that the works procedure has been filed, that you hold a copy with its registration number and, if required, the town hall's decision.

Sources

ajuntament.barcelona.cat

seuelectronica.ajuntament.barcelona.cat

w123.bcn.cat

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property