
How do you work out an indicative renovation price per m²?
An indicative renovation price is calculated like this: the area to be renovated in m² multiplied by the tier rate. Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m², all excluding VAT. A 100 m² flat at Premium starts from €100,000.
These are starting values for a conversation. The exact scope and price come from the quote after a site visit and measurements; how we do that is set out in our article on preparing a quote. Here we look at how to use the table so that the first figure is useful rather than random.
Which floor area should you use to estimate a renovation price?
Use the usable floor area of the rooms being renovated: measured inside the walls, excluding external wall thickness and any share of common areas. The cadastral area in a listing is usually noticeably larger than the usable area, and multiplying that inflates the first figure.
If you have a plan, add up the room areas. If not, measure each room at floor level with a tape. Count terraces and balconies separately: renovating them works differently and the per-m² rate for interiors does not fit. If you are only doing part of the home, say the kitchen and two bathrooms, the calculator makes little sense: a partial renovation is priced by the work involved, not by area.
How do I choose the finish level for my renovation?
The tier is defined not by words like 'budget' or 'luxury' but by the solutions you want in the home. Premium is a full renovation with good materials and well-planned services, without bespoke details. Luxury adds more bespoke furniture, pricier finishes, considered lighting and climate control. Signature means natural materials, complex details, concealed doors and bespoke joinery in almost every room.
A simple test: open your reference images. If they show herringbone parquet, doors flush with the wall and floor-to-ceiling built-ins, that is not Premium, however much you might wish it. The exact content of each tier is fixed in the quote; these descriptions only help you choose the starting rate.
How much does it cost to renovate 60, 110 or 180 m²?
A 60 m² flat in Gràcia: Premium from €60,000, Luxury from €120,000, Signature from €180,000. A flat the size of Urgel in the Eixample, 109.80 m²: Premium from €109,800, Luxury from €219,600, Signature from €329,400. A 180 m² house in Castelldefels: Premium from €180,000, Luxury from €360,000, Signature from €540,000.
All figures exclude VAT. Whether IVA is 10% or 21% depends on conditions explained in a separate article. These amounts are table arithmetic, not the prices of real projects, including Urgel.
What pushes the final renovation price up or down?
Upwards: replacing stacks and the fuse board in an old building, a new layout with reinforced load-bearing walls, heat-recovery ventilation, new windows, a walk-up with no lift or a narrow street with no room for a skip. A small floor area also pushes the rate up: a kitchen and bathrooms cost about the same in a 50 m² flat as in a 90 m² one, but are spread over fewer metres.
Downwards: services in good condition, keeping the layout, large living spaces with a single kitchen and bathroom. Items the table does not cover go on separate lines of the quote: council permits, appliances and non-bespoke furniture.
What should you do with the indicative renovation figure?
Compare the result with your budget. If the gap is large, think about what could come out of the scope rather than dropping the tier for the whole job: sometimes Luxury in the main rooms, leaving alone what is in good condition, works better.
Then send us the area, address, plan and photos. We reply within an hour, arrange the visit and, after measuring, prepare an itemised quote. The work is done by our own crew, with specialist trades handled by trusted subcontractors, one person in charge of the site and staged payments under the contract.
Frequently asked questions
How much does a full renovation cost per square metre in Barcelona?
In the BCN YARD table, a full renovation starts from €1,000/m² at Premium level, €2,000/m² at Luxury and €3,000/m² at Signature, all excluding VAT. A 100 m² flat at Premium starts from €100,000. These are starting values: the exact scope and price are set in the quote after a site visit and measurements.
Which area should be multiplied in the renovation calculator?
The renovation calculator uses the usable floor area of the rooms being renovated, measured inside the walls, excluding external walls and shared areas. The cadastral area in a listing is usually noticeably larger and inflates the figure. Terraces and balconies are priced separately, and a partial renovation is priced by the work involved, not by area.
What does the indicative per-m² renovation price not include?
The indicative per-m² renovation price excludes VAT, free-standing furniture, appliances, professional fees and town hall procedures and permits. These items appear as separate lines in each project quote. Nor does it replace a site visit: the real condition of the building services can move the figure up or down.
Why does a small renovation cost more per m²?
A small renovation costs more per m² because the kitchen and bathrooms cost roughly the same in a 50 m² flat as in a 90 m² one, but are spread over fewer square metres. Replacing risers and the consumer unit, reconfiguring the layout with load-bearing wall reinforcement, or a building with no lift also push the figure up.
Sources
Spanish Tax Agency: which VAT rate applies to works on dwellings?
Barcelona City Council: ICIO, tax on construction, installations and works