An interior staircase in a duplex: safety, space and design

A duplex staircase is planned first: step sizes, the slab opening and headroom fix its place on both floors, and the material is chosen afterwards.

Staircase · work in progress · house with a pool
BCN YARD project · House with a pool

What comes first when planning a duplex interior staircase?

An interior staircase in a duplex has to pass on safety and geometry first and on looks second. Riser height, tread depth, flight width, headroom and balustrades decide how much space the stair takes on both floors. Material and shape are chosen within those limits.

The mistake we see most often is drawing the staircase last, once both floor plans have been signed off. It ends up too steep, too narrow or cutting into a walkway. The right order is the reverse: position and type of stair first, everything else around it.

What step dimensions make a staircase comfortable and safe?

An old rule describes how comfortable a stair is: twice the riser plus the tread roughly equals an adult's stride, about 62–64 cm. A step 17–18 cm high with a 28–29 cm tread is easy going. Push the riser to 21–22 cm to shorten the flight and walking down with a cup of coffee becomes unpleasant, and for children or older people, dangerous.

Minimum requirements for stairs and balustrades are set by the Código Técnico de la Edificación, in its safety-in-use document (DB SUA). The project technician checks the exact values for your case, and we advise against designing right at the limit: the regulation is a floor, not a target.

Check headroom separately. The opening in the floor slab has to be long enough for a tall person not to catch the edge on the way up. That opening is what takes area from the upper floor, and it gets forgotten when people only measure the stair's footprint below.

Which type of staircase takes up the least space?

A straight flight is the most comfortable and the simplest to build, but it needs length. L- and U-shaped stairs, with a landing or winders, are more compact and give you a resting point halfway. Winders save metres, but they are harder to walk on at the narrow end, so their width is checked along the walking line.

A spiral stair takes the least floor area, but you cannot carry a sofa up it and laundry is awkward. It makes sense as a secondary stair, say to a roof terrace, not as the main link between two living floors.

Cantilevered treads fixed into the wall look light, but the wall has to take that load. In an older building that means a structural check of its own, and sometimes a hidden steel section.

When does an interior staircase need a project and a permit?

If you are joining two flats vertically or cutting an opening in a floor slab, you are altering the building's structure. As a rule that work needs a technical project and a permit from the Ajuntament, and in an apartment building the agreement of the comunidad de propietarios as well. The permit type and timescales are confirmed with the Ajuntament or a gestor.

In a detached house, say in Castelldefels, the stair is part of the project from the start: the opening, edge reinforcement and fixings are calculated along with the rest of the structure. Moving it once the slab has been poured is expensive and slow.

Which materials, balustrade and lighting suit the staircase?

Solid oak treads, microcement over a concrete base, a steel stringer with timber treads: all of these work in a high-end interior. When choosing, think about sound and wear. Steel without damping pads rings underfoot, and polished stone is slippery in socks.

A glass balustrade takes up no visual space but needs precise fixings and frequent cleaning. Vertical balusters are safer than horizontal rails, which a child can climb. The handrail should sit comfortably in the hand and run continuously along the whole flight.

Lighting the treads with wall lights or an LED strip under the nosing is first of all about safety at night. Put switches at the top and bottom. The space under the stair works well for built-in storage, but leave access to any services or wiring that run through it.

What should you check before ordering the staircase?

The order is: position and type of stair on both plans, size of the slab opening allowing for headroom, step calculation based on finished floor levels rather than bare concrete, fixing method, balustrades, lighting and, last of all, material. Measurements for manufacture are taken after the screed and allow for the thickness of the final floor; otherwise the first or last step ends up a different height. It is one of the most noticeable mistakes, because your foot feels it straight away.

If you are planning a duplex in Barcelona or a house on the coast, send us the plans of both floors. We reply within an hour, come to measure and show you where the stair takes the least usable area without giving up comfort.

Frequently asked questions

What riser height and tread depth should interior stairs have?

A step with a 17–18 cm riser and a 28–29 cm tread is easy to climb. The classic rule says two risers plus one tread equal an adult stride, about 62–64 cm. With 21–22 cm risers, going down becomes uncomfortable and, for children or older people, dangerous. The minimums are set by Spain's Technical Building Code, document DB SUA.

Do you need a permit to cut an opening in the floor slab for a staircase?

Cutting an opening in a floor slab or joining two homes vertically is work on the building's structure. As a rule it requires a technical project and a permit from the Ajuntament and, in a block of flats, the agreement of the comunidad de propietarios as well. The permit type and timescales are confirmed with the Ajuntament or a gestor.

Does a spiral staircase work as the main stair in a duplex?

A spiral staircase takes the least floor area, but it is a poor main link between two living floors: a sofa will not go up it and carrying laundry is awkward. It makes sense as a second stair, for example up to a terrace. For the main stair, a straight flight or an L- or U-shaped stair is more comfortable.

Which balustrade is safer in a home with children?

In a home with children, a balustrade with vertical balusters is safer than one with horizontal rails, which a child can climb. A glass balustrade barely registers visually, but it needs precise fixings and frequent cleaning. Whichever you choose, the handrail must sit comfortably in the hand and run continuously along the whole flight.

Why can the first or last step end up a different height?

The first or last step ends up a different height when the stair is calculated from the concrete rather than from finished floor levels. Manufacturing measurements are taken after the screed and must include the thickness of the final flooring. It is one of the most obvious staircase mistakes: your foot notices straight away.

Sources

CTE: safety in use and accessibility

Barcelona City Council: preliminary works consultation

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property