BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

Commissioning interior design remotely

For a remote brief the studio needs how you live, a plan and photos with unverified dimensions flagged, the budget level and clear approval rules. An on-site survey is still needed.

Bedroom · completed work · Eixample flat, Barcelona
Project photograph: Urgel · BCN YARD

What does the studio need to design your interior remotely?

To commission interior design remotely, the studio needs five things: a description of how you live; a plan and photos of the flat, flagging which dimensions are unverified; the budget level; a list of what is being kept; and approval rules — who signs off, in what format, and where decisions are recorded.

Videos and the plan from the sales listing are fine to start with, but an on-site survey is still needed. Distance changes how you communicate, not the amount of work: the design has to be as precise as if you lived round the corner.

What should you tell the designer about how you live?

Who will live in the flat and for how many months a year. Who cooks and how: daily, or at weekends for guests. Whether you need a workspace with decent light for video calls. How much clothing, sports kit and luggage. Any pets. What annoys you about where you live now.

References help when each comes with a comment: “I like the light from the window”, “I like the wood texture, not the wall colour”. A folder of a hundred images with no notes usually mixes incompatible ideas and leaves the designer guessing, and guessing at a distance costs extra rounds of revisions.

How do you separate facts from assumptions in plans and measurements?

Send everything you have: the plan from the deeds or the listing, photos of every room from all four corners, a video walk-through with a tape measure in shot. Flag from the start which dimensions are checked and which come from the sales plan. Listing plans are often out by tens of centimetres, and in old Eixample buildings the walls are rarely square.

A video call helps to understand the brief but does not replace a survey. We arrange the site visit and measurements: ceiling heights, positions of soil stacks, windows and radiators, the consumer unit. From then on the design shows what is confirmed and what is still an assumption.

Why state the budget level up front?

A design with no budget looks great in a render and is useless on site. We work with three indicative renovation levels, excluding VAT: Premium from €1,000/m², Luxury from €2,000/m², Signature from €3,000/m². For a 100 m² flat the gap between levels runs to hundreds of thousands of euros, and a Signature design on a Premium budget will have to be redone.

We set exact scope and price in the quote after a site visit and measurements. But naming a level at the start lets the designer choose materials that fit it from day one.

How are design decisions approved at a distance?

One contact person on your side and one on ours. A versioned decision log: what is approved, when and by whom, what is still open. Regular calls at a time that works for both time zones.

Do not approve colour or texture on a screen: monitors and lighting distort shades. For important finishes, physical samples: we can post them to you or show them to someone you trust here. The approved sample is labelled and kept until the end. Anything undecided is written down before purchasing, not discovered on delivery day.

Also agree who decides when you cannot be reached, say during two weeks of holiday off-grid. A trusted person authorised to approve minor substitutions, or the rule “we wait for your answer and the schedule moves”: both work if chosen in advance, not when the crew is already standing idle.

How do you keep control of the build while you are away?

If the design moves into a build, the distance remains. Weekly photo reports and a video call from site at the key moments: before walls are closed, when all services are visible; before tiling, when the setting-out is approved; and at handover. Those three visits, in person or by video, give more control than daily messages.

One person runs the project in Spanish and Russian, so you do not have to act as interpreter between designer, site manager and suppliers.

How do you start a remote interior design project with BCN YARD?

Send us the plan, photos and a couple of paragraphs on how you want to live in the flat. We reply within an hour, arrange a measuring visit and propose an approval routine that suits your time zone.

Frequently asked questions

What should you send to commission interior design remotely?

To commission interior design remotely, the studio needs five things: a description of how you live; a plan and photos of the flat, marking which measurements are unverified; the budget level; a list of what is being kept; and approval rules stating who decides, in what format and where decisions are recorded.

Is a video call enough to design a flat without measuring it?

A video call helps to understand the brief, but it does not replace measuring the flat. Plans from sales listings are often out by tens of centimetres, and in old Eixample buildings walls rarely meet at right angles. BCN YARD arranges a site visit and measures ceiling heights, soil stacks, windows, radiators and the consumer unit.

Can colours and finishes be approved on screen?

Colours and textures should not be approved on screen, because monitors and lighting alter the tones. For important finishes, physical samples are used, either sent to the client or checked by someone they trust locally. The approved sample is labelled and kept until the end of the works.

How can you follow a flat renovation in Barcelona while living abroad?

To follow the works from abroad, weekly photo reports and video calls from site at three key moments work best: before walls are closed, with all services visible; before tiling, to approve the layout; and at handover. Agree in advance who approves minor changes if you cannot be reached.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property