Living-dining room: how to design a space serving several functions

A living-dining room works when zones, walkways and electrics are decided together with furniture to scale, before the works begin.

Living room · work in progress · house with a pool
BCN YARD project · House with a pool

What makes a living-dining room work well?

A living-dining room works when each use has a recognisable zone, walkways between them are at least 80–90 cm wide, and lighting and sockets are placed for the final furniture layout, decided before the renovation. If the order is reversed, works first and furniture later, you end up with a pendant hanging off-centre from the table and a sofa with a cable running across the floor.

That is why in our projects the scaled furniture plan is drawn before the electrical plan. It is one more sheet in the drawings, and it prevents most of the problems in this room.

How should zones and the main route be laid out in a living-dining room?

Almost every living-dining room has three zones: eating, sitting and storage. Add to that a route that must not cut through any of them: the path from the front door to the kitchen, the bedrooms or the terrace. If that path passes between the sofa and the TV, someone is always interrupting.

Draw the route first and place the zones on either side. The table usually goes near the kitchen, the sofa in the quietest part, and the storage wall where it does not steal light from the windows. In an Eixample flat with balconies onto the street, the sitting area usually takes the facade and the dining area sits in the middle, closer to the kitchen.

What minimum dimensions does a living-dining room need?

Behind an occupied chair you need about 80–90 cm to stand up without hitting the wall or the furniture behind; if people walk through there, 100 cm or more is better. Between the sofa and the coffee table, around 40–45 cm. A main walkway narrower than 80 cm is something you notice every day.

The table is sized from these dimensions, not just from the number of diners. An extendable table handles dinners with guests without stealing space the rest of the year, as long as its open size also fits with the chairs. Our article on dining-table planning covers shapes and seating in detail.

How do you plan lighting and sockets in a living-dining room during the works?

Each zone needs its own lighting circuit. The dining pendant is centred over the table, so its ceiling point depends on where the table goes; with an extendable table, it is centred on the everyday position. The sitting area works better with indirect light and floor lamps, which need sockets in the right places.

If the sofa floats in the middle of the room, away from the walls, a floor socket avoids a cable crossing the room. That socket is decided before the screed, not after the parquet is down. The TV wall needs power, data and an empty conduit for future cables. We cover lighting scenarios in detail in another article.

What storage and materials suit a multi-use living-dining room?

A living-dining room used for eating, working and hosting collects objects from all those uses: occasional tableware, paperwork, games, chargers. A bespoke storage wall with flat doors absorbs all of that and keeps the room calm. Decide what goes inside first, then design the fronts.

A continuous floor across living and dining areas, with no change of material, makes the space read as one. In the Urgel flat in the Eixample, with its open kitchen and herringbone parquet, the timber floor is what gives the day zone its unity. Under the table, a material that tolerates dragged chairs and the odd spill avoids trouble; rugs are better kept out of the dining area.

How do you stop a large living-dining room from echoing?

A large living-dining room with wood or porcelain floors, high ceilings and little fabric echoes: a dinner for six becomes loud and the TV has to be turned up. In the ceilings over three metres high found in many Eixample buildings this is especially noticeable.

The fix is planned in the design: heavy fabric curtains, an upholstered sofa, shelves with books, a rug in the sitting area and, if needed, absorbent panels built into the joinery or the ceiling. If the kitchen is open, a quiet extractor hood belongs in the same conversation.

How does BCN YARD approach the design of a living-dining room?

At the first meeting we ask how many people eat at home daily, how many at a dinner with guests, whether anyone works from home and where the TV is watched. From that we draw the furniture to scale, then electrics and lighting, and only then choose finishes. If you want your living-dining room reviewed before the renovation, send us the plan; we reply within an hour.

Frequently asked questions

How much space is needed behind a dining chair?

Behind an occupied dining chair you need about 80–90 cm to stand up without hitting the wall or the furniture behind. If people also walk past behind the chair, 100 cm or more is better. The table is sized from these dimensions, not just the number of diners, and a main route under 80 cm is felt every day.

What distance should there be between the sofa and the coffee table?

Leave about 40–45 cm between the sofa and the coffee table. In the same living-dining room, routes between zones should be at least 80–90 cm wide, and the main route from the entrance to the kitchen, bedrooms or terrace should not cut through the seating area between the sofa and the TV.

Where does the dining light go if the table extends?

The dining light is centred over the table, so its ceiling point depends on where the table sits. If the table extends, the light is centred on its usual, closed position. That is why the scaled furniture plan is drawn before the electrical plan, and each zone of the living-dining room gets its own lighting circuit.

How do you avoid a cable running across the room to the sofa?

If the sofa sits in the middle of the room, away from the walls, a floor socket avoids a cable across the room. That socket is decided before the screed is laid, not after the parquet goes down. This is why the final furniture layout is fixed before the renovation and the electrics are designed from it.

Why does a large living-dining room echo, and how is it fixed?

A large living-dining room echoes when it has timber or porcelain floors, high ceilings and few soft furnishings; it is most noticeable with ceilings over three metres. The fix is planned in the design: heavy fabric curtains, an upholstered sofa, bookshelves, a rug in the seating area and, if needed, absorbent panels built into furniture or the ceiling.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property