BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

A home workspace that fits the interior

A home workspace is designed around how you work: hours, calls, equipment. That sets its location, lighting, acoustics, sockets and storage.

Centre room · completed work · child psychology centre, Barcelona
BCN YARD project · Child psychology centre, Barcelona

Where do you start when designing a home workspace?

A home workspace is designed from how you actually work, not from a photo: how many hours a day you spend at a screen, how many calls you take, what equipment and paperwork you use, and whether you need a door you can close. That decides whether it becomes a study, a corner of the living room or a desk built into a cupboard.

A laptop for a couple of hours a week and a full day with two monitors and video calls are different problems. The first is solved by a good chair by the window. The second needs a room, or at least a zone with decent acoustics, lighting and sockets.

Separate room, niche or cupboard: which workspace suits you?

A room with a door is needed if you spend a lot of time on the phone or handle confidential documents. In a four-bedroom flat such as Urgel in the Eixample, one bedroom is often set up as a study that can double as a guest room.

A niche in the living room works for jobs without constant calls, provided the rest of the family is out during the day. A desk inside a cupboard with hinged or folding doors suits places where the workspace needs to disappear in the evening. That desk has to be comfortable when open with someone sitting at it, not just tidy when closed.

How should the screen sit relative to the window and the light?

Place the screen at right angles to the window. With the window behind you, you get reflections on the monitor; with the window behind the screen, you get glare. For video calls, light should reach your face from the front or side, not from behind.

In the evening you need task light on the desk and general light in the room, so there is no harsh contrast between a bright screen and a dark wall. Those circuits go into the electrical design, with switches by the desk. Lighting scenes have their own article.

How do you improve workspace acoustics for calls?

A room with bare walls, a tiled floor and big windows sounds like an echo chamber, and the person on the other end hears it on every call. Soft surfaces help: curtains, a rug, bookshelves, upholstered furniture, acoustic panels hidden behind a cupboard front.

If the workspace is next to a child’s room or the living room, think about noise coming the other way as well. An insulated partition and a door with seals are easier to build during a renovation than to fight later with headphones. How to describe an acoustic problem is covered in a separate article.

What sockets and cabling does a home workspace need?

List everything that will sit on the desk: computer, monitors, printer, lamp, chargers, router or access point. Count the sockets and add spare. Put them at desk height or in a trunking under the top, not at floor level behind the desk.

For reliable work, run a data cable to the desk even if the home Wi-Fi is good. During a renovation it costs little; later, it means opening a wall. Cables from the desk go into a channel or a leg, so there is no tangle underneath.

How do you organise storage and close the workspace at the end of the day?

Documents, equipment, paper and headphones need a home. Closed storage next to the desk keeps the area calm, especially in a living room or bedroom. Shelf depth and height are set by your actual files and devices, not by a catalogue.

Think about how the workspace closes at night. A cupboard door, a sliding panel or simply a drawer for the laptop helps separate work from home when there is no dedicated room.

What should you give the designer to plan the workspace?

List your equipment with dimensions, describe your working day hour by hour, and note where the flat is quietest and where the light is best. Add who else uses the space and when. A photo of a beautiful desk from the internet is not a brief: it does not show where the sockets are, which way the window faces or where the printer goes.

BCN YARD links that brief to the interior design and the renovation: wiring, data and joinery are planned from the start rather than added after you move in.

Frequently asked questions

Do you need a separate room with a door to work from home?

A room with a door is needed if you spend a lot of time on the phone or handle confidential documents. A niche in the living room works for jobs without constant calls, provided the rest of the family is out during the day. A desk inside a cupboard suits places where the workspace must disappear in the evening, as long as it is comfortable when open.

Where should a desk go relative to the window?

The desk screen goes at right angles to the window. With the window behind you, you get reflections on the monitor; with the window behind the screen, you get glare. For video calls, light should reach your face from the front or side, not from behind. In the evening you need task light on the desk and general light in the room.

How do you avoid echo on video calls from home?

A room with bare walls, a tiled floor and big windows sounds like an echo chamber on every call. Soft surfaces help: curtains, a rug, bookshelves, upholstered furniture and acoustic panels hidden behind a cupboard front. If the workspace is next to the living room or a child's room, an insulated partition and a door with seals are easier to build during a renovation.

Do you need a data cable at the desk if the Wi-Fi is good?

Yes, for reliable work it is worth running a data cable to the desk even if the home Wi-Fi is good. During a renovation it costs little; later it means opening a wall. Sockets are counted from your equipment with spare added and placed at desk height or in trunking under the top, not at floor level behind the desk.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property