
Can the hob be chosen on its own?
Compare the complete installation rather than the appliance price alone. Keeping gas may retain an existing supply, but its condition and ventilation requirements still need checking. Induction changes the electrical requirements. Before buying, ask qualified installers to confirm what can stay, what needs alteration and which documents will be provided.
Capacity, distribution board and other appliances
List appliances likely to run together: hob, oven, heating or cooling, water heater and dishwasher. An electrician should check the circuits, protective devices and installation capacity; increasing the supply allowance does not fix an unsuitable circuit. Separate internal electrical work from utility procedures or work controlled by third parties in the estimate.
Extraction and cabinetry
Induction does not remove the need to deal with steam, odours and moisture. Review extraction, replacement air and the hob and hood instructions. Check the space below the worktop, cabinet ventilation, manufacturer clearances and compatibility with drawers or an oven. Send the exact appliance specification to the cabinet maker before fabrication.
What happens if gas is removed
Removing a gas hob is not the same as decommissioning the whole installation. Other appliances or shared building services may still be connected. Ask the professional to establish the work needed and any arrangements with the supplier. A pipe should not simply disappear behind cabinetry without a documented technical solution.
Checklist before approving the order
Collect the hob model, specification, connection plan, extraction design and cabinet detail. Request separate allowances for alterations, commissioning and documentation. Agree with the installer what will be tested at completion. If the hob type changes after cabinetry has been made, recheck the worktop, cut-out, ventilation and connections before accepting the change.
Frequently asked questions
Does induction mean a hood is unnecessary?
It still produces steam, odours and moisture during cooking. Ventilation and extraction must suit the room and appliances; changing the energy source does not replace that design.
Is increasing the electrical supply enough?
Not necessarily. An electrician must check wiring, circuits and protective devices before deciding what the installation and supply need.