
How much does a full renovation cost per m²?
A full renovation with us starts at 1,000 EUR/m² at Premium level, 2,000 EUR/m² at Luxury and 3,000 EUR/m² at Signature, all excluding VAT. For a 100 m² flat that means from 100,000, from 200,000 and from 300,000 EUR respectively.
These are benchmarks, not fixed packages. The exact scope and price come in the estimate after we visit and measure your property. Below: what typically separates the levels and why the same floor area can land at different ends of the range.
What does “from” mean, and what pushes the renovation price up?
From is the floor for a flat in reasonable condition with no complicated surprises. Within each level, price rises with things unrelated to the finishes you pick: old soil stacks and wiring, relocating wet rooms, demolishing and building partitions, high ceilings that need more material and scaffolding, no lift, comunidad restrictions on working hours, structural work.
A 110 m² flat in the Eixample with 3.5-metre ceilings, timber beams and a bathroom you want to move will cost noticeably more than the minimum of any level, even with identical tiles. What drives the cost of a flat renovation in general has its own article; here the focus is the levels themselves.
What does the Premium level from 1,000 EUR/m² include?
Premium is a full renovation with new services, trued walls and floors and good-quality standard materials. The layout usually changes little, doors and kitchen come from manufacturers' standard ranges, and the finish is tidy but without made-to-measure pieces.
It makes sense when the flat is being prepared to let or sell, when the layout already works, or when budget matters more than personalisation. The technical side is not cut back: pipework, electrics and waterproofing are done the same way as at the higher levels.
What does the Luxury level from 2,000 EUR/m² include?
Luxury brings a bespoke interior design. Made-to-measure joinery, concealed doors flush with the wall, lighting planned in scenes, herringbone or wide-plank parquet, an open kitchen with an island, air conditioning hidden in the ceiling. The layout often changes properly: a dark corridor becomes a walk-in wardrobe, the kitchen opens onto the living room.
This is where design time grows the most. Every bespoke item needs a drawing, approval and a manufacturing lead time, so decisions have to be made earlier than at Premium.
What does the Signature level from 3,000 EUR/m² include?
Signature is the level where almost nothing comes from a catalogue. Large-format natural stone with book-matched veining, designer or artisan furniture, metal and glass to bespoke drawings, heat-recovery ventilation, integrated home-control systems and acoustics tuned to each room.
This is where most time goes into design, samples and supply: a marble slab can take weeks to arrive and its cutting plan is agreed to the millimetre. The price per square metre rises not only because of materials but because of the amount of coordination and the precision of the work.
What should you check in the estimate beyond the price per m²?
Price per square metre is handy for a first conversation, but the contract is signed on the estimate. Check how VAT is shown and at which rate (it depends on the specific transaction; there is an article on it), whether design and permit, kitchen, integrated appliances, light fittings and bespoke furniture are included, and what is listed as excluded.
Two estimates at 2,000 EUR/m² can differ by tens of thousands of euros simply because one includes the kitchen and joinery and the other does not.
How do you choose the right renovation level?
Ask yourself how many years you will live in the flat, who it is for and what bothers you about it now. If it is your home for decades, saving on concealed doors or lighting is usually felt every day. If the flat is for letting, Premium with sound engineering makes more sense.
Levels can be mixed: the whole flat at Luxury, with the kitchen and main bathroom closer to Signature. That approach often gives a better result for the same money than one uniform level across the whole floor area. We discuss it at the first visit, and we reply to enquiries within an hour.
Frequently asked questions
How much does it cost to renovate a 100 m² flat in Barcelona with BCN YARD?
A full renovation of a 100 m² flat with BCN YARD costs from 100,000 EUR at Premium level, from 200,000 EUR at Luxury and from 300,000 EUR at Signature, excluding VAT. These are benchmarks, not fixed packages: the exact scope and price come in the estimate after the property is visited and measured.
Which factors push a full renovation above the “from” price?
A full renovation price rises with things unrelated to finishes: old soil stacks and wiring, relocating wet rooms, demolishing and building partitions, high ceilings needing more material and scaffolding, no lift, comunidad restrictions on working hours, and structural work. An Eixample flat with 3.5-metre ceilings and a relocated bathroom will cost noticeably more than the minimum.
What is the difference between the Premium and Luxury levels?
Premium is a full renovation with standard materials, doors and kitchen from standard ranges and few layout changes. Luxury adds a bespoke interior design, made-to-measure joinery, concealed doors, lighting in scenes and real layout changes. The technical side, such as pipework, electrics and waterproofing, is done the same way at both levels.
What should you check in a full renovation estimate?
In a full renovation estimate, check how VAT is shown and at which rate, whether design and permit, kitchen, integrated appliances, light fittings and bespoke furniture are included, and what is listed as excluded. Two estimates at 2,000 EUR/m² can differ by tens of thousands of euros simply because one includes the kitchen and joinery and the other does not.
Can different levels be combined in one renovation?
Yes. Renovation levels can be mixed, for example the whole flat at Luxury with the kitchen and main bathroom closer to Signature. That approach often gives a better result for the same money than one uniform level across the whole floor area. To choose, think about how many years you will live there and who the flat is for.
Sources
Spanish Tax Agency: VAT rate for renovation and repair works on dwellings