
How do you decide what to keep and what to replace in a renovation?
It makes sense to keep whatever is in good condition, does not get in the way of new services, and is the reason you chose the flat in the first place. Everything else gets replaced. The decision is made before strip-out, element by element, comparing the full cost of both options.
In Eixample and Gràcia flats the conversation is usually about the same things: hydraulic tile floors, ceiling cornicing, timber doors and windows with inner shutters, exposed beams and Catalan vaulting. Each has its own risks, covered below.
Can hydraulic tile floors be kept in a renovation?
Patterned cement tiles are the main reason people buy flats in old Eixample. They can stay in place, be ground and sealed. But pipes often need replacing underneath, and moving partitions leaves "scars" where the walls stood.
The other option is to lift them carefully and relay them in one or two rooms, or use them as a rug-like panel in the middle of a new floor. Some tiles break when lifted, so you first work out how many you need and lift extra. Missing pieces can sometimes be found through restorers, or similar ones made to order, but the colour will never match exactly.
How do you keep cornicing and high ceilings with modern services?
Ceiling cornicing clashes with modern services. Ducted air conditioning, ventilation and recessed lighting need a dropped ceiling or bulkheads, which hide the cornicing. If you want to keep it, the routes go through the corridor, bathrooms and dressing areas, where the ceiling is lowered anyway, and rooms with cornicing get wall grilles or a different climate system.
Cracks and loose sections are assessed before work starts. Vibration from demolition nearby can bring down a weak piece, so it is secured beforehand or taken down for restoration.
Should old doors, windows and shutters be restored or replaced?
Old panelled doors are often more beautiful than new ones and made of better timber. Restoring them means stripping layers of paint, repairs, adjusting them to the new floors (the floor level almost always changes) and new ironmongery. All of that must be costed before comparing with a new door.
Old windows are trickier. They preserve the look of the facade but insulate poorly. The options are restoring them and adding secondary glazing inside, replacing the glass with slim double glazing if the frame can take it, or replacing the whole window. In protected buildings, changing external windows may need approval, which is worth confirming with the ajuntament before you decide.
Can timber beams and Catalan vaults be left exposed?
Exposed timber beams with Catalan vaulting look wonderful, but under the plaster they may hide rot from old leaks or signs of woodworm. Before deciding whether to leave them exposed, the beams are inspected, especially next to bathroom walls and at the facade.
If strengthening is needed, a qualified technician designs it. Sometimes it can be hidden, sometimes it changes the look of the ceiling. Better to know that before the design shows a perfect exposed ceiling.
What can you do with cast-iron radiators, an old bath and ironmongery?
Cast-iron radiators can be removed, flushed, pressure-tested and repainted. They work well with a new boiler or heat pump if the system is sized for them. But they are heavy and take up space under the window, which you need to remember when planning furniture.
An old claw-foot bath can be restored with a new enamel finish, but first you check that the floor can take its weight when full, and what state the drainage is in underneath. Brass handles, espagnolette bolts and window catches are usually kept: restoring them costs less than finding a good copy, and they carry most of the flat's character.
How do you compare keeping versus replacing, and protect what stays?
Keeping is not free. Its cost includes restoration, protection during the works, adapting to the new elements and junctions with new floors and walls. Replacing includes removal, disposal, new material and finishing. Comparing "new parquet versus zero" is almost always misleading.
The approved list of retained elements, with photos and positions on the plan, goes to everyone working on site before strip-out. Each element is protected, and one specific person is responsible for it; on our projects, the person in charge of the job. We work in Russian and Spanish, prepare the quote after the site visit and measurements, and take staged payments under the contract. We reply to enquiries within an hour.
Frequently asked questions
Which features of an older flat are worth keeping in a renovation?
It is worth keeping whatever is in good condition, does not get in the way of new services and is the reason you chose the flat. In Eixample and Gràcia this usually means hydraulic tile floors, cornicing, timber doors and windows with inner shutters, exposed beams and Catalan vaulting. The decision is made before strip-out, element by element.
Is keeping an original feature cheaper than replacing it?
Not necessarily, because keeping is not free. Keeping includes restoration, protection during the works, adapting to new elements and junctions with new floors and walls. Replacing includes removal, disposal, new material and finishing. Comparing a new material price against zero is almost always misleading: you need to compare complete solutions.
Can hydraulic tiles be lifted and relaid?
Yes, hydraulic tiles can be lifted carefully and relaid in one or two rooms, or used as a rug-like panel in the middle of a new floor. Some tiles break when lifted, so you first work out how many you need and lift extra. Missing pieces can be found through restorers or made to order, but the colour will never match exactly.
What are the options for old timber windows?
Old timber windows preserve the look of the facade but insulate poorly. You can restore them and add secondary glazing inside, replace the glass with slim double glazing if the frame can take it, or replace the whole window. In protected buildings, changing external windows may need approval, which is confirmed with the ajuntament before you decide.
How are retained features protected during the works?
Retained features go on an approved list, with photos and positions on the plan, which is given to everyone working on site before strip-out. Each element is protected, and one specific person is responsible for it. If restoring a piece is uncertain, the review and decision process is agreed in advance.
Sources
Barcelona City Council: online building permit procedure (prior consultation)