BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

Home automation in a flat renovation: how it differs from a new house

In a full renovation it pays to run smart-home cabling from the start; in a partial one, wireless systems do the job. What to decide before the walls close.

Façade · completed work · house with a pool
BCN YARD project · House with a pool

How does home automation in a flat differ from a new house?

In a flat, home automation comes down to one question: will the walls be opened? If the renovation is comprehensive, cabling and back boxes go in just as in a new build; if it is partial, a wireless system usually makes more sense than chasing into recent finishes.

A new house starts from a blank sheet. A flat means working with what is there: load-bearing walls that cannot be chased freely, soil stacks, a shared facade and common services owned by the comunidad de propietarios. Smart homes in new builds have their own article; this one is about flats.

What should you put in for home automation if the walls are opened?

In a full renovation the wiring is being replaced anyway, and adding a few cables costs little compared with opening up again later. A sensible minimum: a neutral in every switch box so a smart switch can be fitted; deep back boxes to take modules; cable to blind or curtain motors; data cable to the TV, the desk and the Wi-Fi access points; and power where sensors and a hub will go later.

Everything runs back to one technical cupboard with the router and low-voltage panel. Its position is settled before the partitions go up, with ventilation and access, not in a storeroom nobody can reach.

Do wireless systems work for a partial renovation?

Wireless switches, relays behind existing switches, battery motors, thermostats and sensors all go in without chasing walls. It is a sensible route in a flat with recent finishes, or when the family is living at home during the works.

Know the limits up front. In older buildings with thick brick walls the signal struggles and you will need extra network nodes. Battery devices need new batteries. Some systems rely on the manufacturer’s cloud and on the internet. Choose equipment that runs locally and supports open standards, so you are not tied to a single brand.

Where should you start with home automation in a flat?

First write down what annoys you today. Too much light in the bedroom in the morning. Heating running when nobody is home. Long trips with no idea what is happening in the flat. Each of these has a specific answer: a scene for the blinds, a thermostat with a schedule per room, leak sensors with a solenoid valve on the incoming water supply.

Leak sensors under the sink, dishwasher and washing machine are the most useful and cheapest part of home automation in a flat. A leak in an apartment building reaches the neighbour below, and a valve that shuts the water off by itself pays for itself the first time it triggers.

Where does automation pay off most: lighting or climate?

Lighting gives the most visible result: evening, film or night scenes instead of six switches. But scenes only work if the lighting was designed in layers: general, task and accent. If a room has one ceiling light, there is nothing to automate.

Climate is where the savings are. Air conditioning or aerothermal heat pumps with room-by-room control mean empty bedrooms are not being cooled. Before buying, check that the equipment accepts external control, and place temperature sensors where the sun does not hit them.

What do the comunidad and the building restrict?

The facade, the shared entry-phone, in some buildings the external shutters, and the roof belong to the comunidad de propietarios. You cannot fix a camera to the facade or change the entrance panel without agreement. Inside the flat you can swap your handset for a compatible video monitor, but compatibility is confirmed with the company that maintains the system.

In listed buildings or those with a uniform facade, motorised awnings or external blinds may need approval. The conditions are checked with the building administrator and the ajuntament.

What home automation makes sense in a 110 m² Eixample flat?

Take a flat of around 110 m² in the Eixample with four bedrooms and a full renovation. A sensible plan: cable to the blind motors in the bedrooms, a neutral in every box, wired data to the living room and study, two ceiling Wi-Fi access points, leak sensors in the kitchen and both bathrooms with a valve on the incoming supply, and zoned thermostats. Everything else can be added later, wirelessly and without dust.

The cost of this preparation goes into the renovation quote. Our own crew installs it, trusted specialists configure the systems, and one person is responsible for the whole project.

Frequently asked questions

Is it worth wiring for home automation when renovating a flat?

It depends on whether the walls are being opened. In a full renovation the wiring is renewed anyway and adding cables costs little: a neutral in every switch box, deep boxes, cable to blind motors and network cable to the TV, study and wifi points. In a partial renovation a wireless system usually makes more sense than chasing into recent finishes.

What are the limitations of wireless home automation?

Wireless home automation is installed without chasing walls, but in old buildings with thick brick walls the signal travels less well and extra nodes are needed. Battery devices need their batteries changed, and some systems depend on the manufacturer's cloud and the internet. Choose equipment that works locally and supports open standards.

Which part of home automation is most useful in a flat?

Leak sensors under the sink, dishwasher and washing machine, with a solenoid valve on the water inlet, are the most useful and cheapest part of home automation in a flat. A leak in a block of flats affects the neighbour below, and a valve that shuts off the water by itself pays for itself the first time it triggers.

Can you put a camera on the facade or change the door entry system?

Not without the comunidad's agreement: the facade, the shared door entry system and the roof belong to the community of owners. Inside the flat you can replace your handset with a compatible monitor, but compatibility is confirmed with the company that maintains the system. In protected buildings, motorised external blinds or awnings may need authorisation.

Sources

Civil Code of Catalonia, Book Five, art. 553-41 (common elements)

Civil Code of Catalonia, Book Five, art. 553-36

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property