What home automation decisions must be made before the walls are closed?
Before walls and ceilings are closed up in a new house, you need to settle the smart-home infrastructure: where the equipment cabinet goes, which points get data cable, where empty conduit with draw wire is left, and where power is provided for blind motors, sensors and cameras. The actual system, apps and devices can be chosen later, even after you move in.
The cost gap between installing now and adding later is huge. Now it is a cable and a back box. Later it is chasing finished plaster, repainting, sometimes lifting tiles, all in a house you already live in.
Where should the home automation cabinet go and what does it need?
Every cable ends up in one place: the operator's fibre arrives there, and it houses the router, the network switch, the controller, power supplies and sometimes the video recorder. That cabinet needs an accessible spot, sockets on a dedicated circuit and ventilation, because the kit gets warm. The space under the stairs works if you can open the door and stand in front of it.
In a two-storey house, plan a vertical riser between floors with plenty of spare capacity. In ten years you will want to run something through it that nobody is thinking of today.
Where does a new house need network cabling?
Concrete slabs and thick walls weaken Wi-Fi a lot, so in a new house the access points go on the ceiling of each floor, cabled and powered over the same line. Dedicated cables are also needed to the TV, the home-office desk, cameras, the gate intercom, and an access point in the garden or by the pool.
Allow extra: a second cable to the same point costs very little, and its absence shows the day the TV moves to another wall.
What should you prepare for lighting and motorised blinds and curtains?
Motorised blinds and curtains need power at every window, and room for the motor or a concealed track has to be built into the window and ceiling detail. For lighting, decide whether switches will control circuits through the system or directly, and ask the electrician for deep back boxes and a neutral at every switch: many smart modules will not work without one.
Wired or wireless is a question of reliability and budget. Even if you lean towards wireless, cable to the key points keeps the choice open. Lighting scenes have their own article.
How do you connect solar panels, pool and climate systems to it?
In a new house people usually want the system to cover the solar panels and inverter, a possible battery, an EV charger, the pool pump and filtration, an air-source heat pump or other heat source, and garden irrigation. Each of those needs a data link to the equipment cabinet, or at least an empty duct to it.
On a house with a pool and solar panels (we delivered one such private house through the full cycle in 2022 to 2024), the link to the pool and energy equipment is buried during the services stage. Doing it later means digging up finished landscaping: paths, lawn, irrigation.
Which parts of home automation can wait until after you move in?
The devices, the controller, the apps and the programming of scenes can all be decided after you move in, once you have lived in the house and know what you actually want automated. Technology here moves faster than a house gets built, and buying equipment a year before moving in rarely makes sense.
The only things that cannot wait are what goes inside walls, floors and the ground: cables, conduit, back boxes, power and the cabinet location.
What records should you ask for and what should you ask the team?
Before the walls are closed, ask for photos of every cable route with dimensions and a schedule with each cable labelled at both ends. Without it, a year later nobody will know which cable goes to the bedroom and which to the gate camera.
Ask the project team: where is the equipment cabinet and is it ventilated, how many cables go to each point, is there a neutral at the switches, where are the spare ducts between floors and to the garden. We go through these questions with the client during the services stage of every new house.
Frequently asked questions
What home automation should you plan for when building a new house?
When building a new house, plan the home automation infrastructure before walls and ceilings are closed: the location of the equipment cabinet, network cable points, empty conduits with draw wires, and power for blind motors, sensors and cameras. The actual system, apps and devices can be chosen later, even after you have moved in.
Wired or wireless home automation in a new house?
Choosing wired or wireless home automation is a matter of reliability and budget. Even if you lean towards wireless, having cable at key points keeps the decision open. Concrete floor slabs and thick walls also weaken wifi considerably, so the access points on each floor are connected by cable.
Why do switches need a neutral for home automation?
Many smart lighting modules do not work without a neutral in the switch box. So in a new house, ask the electrician for deep boxes and a neutral at every switch before the walls are closed, and decide whether the switches will control the circuits through the home automation system or directly.
What does a home automation equipment cabinet need?
The home automation cabinet is where all the cables and the operator's fibre arrive, and where the router, switch, controller and power supplies sit. It needs an accessible location, sockets on a dedicated circuit and ventilation, because the equipment gets warm. In a two-storey house, plan a vertical riser between floors with plenty of spare capacity.