Who it is for
For businesses opening, relocating or renewing premises. We connect the space with its use, identity and day-to-day operation.
Services
Renovation of shops, offices and restaurants in Barcelona. Layout, services, budgets and coordination of requirements before opening.

For businesses opening, relocating or renewing premises. We connect the space with its use, identity and day-to-day operation.
Layout, finishes, joinery, installation coordination and preparation of customer, work and service areas.
We check the premises fit and review activity requirements with specialists. Budget and phases are set before work starts.
Ready premises and a list of what remains before opening.
Extraction, climate control, accessibility, power supply, equipment and permits can change cost and timing.
Tell us about the business, intended location and whether you have selected premises. We can begin before purchase or lease.
Renovating commercial premises in Barcelona means coordinating the physical works with the corresponding activity licence or notification, two separate procedures that must progress consistently for the premises to open on the planned date. BCN YARD coordinates both processes, explained in more detail in our guide on activity licensing.
The project for a children’s psychology centre in Barcelona’s Eixample, with 250 m² renovated in five months, illustrates this process: layout, specific services, finishes built for heavy daily use, and healthcare-activity legalisation coordinated from start to finish. You can see this project with real photographs on the projects page.
To renovate commercial premises in Barcelona, share the intended activity and the premises’ floor area so we can anticipate which licensing regime applies and prepare an initial proposal coordinated with that procedure.
How to renovate an office in Barcelona without closing: phasing, noisy-work hours, services with spare capacity and reference prices.
In most cases, yes. The office is split into phases, noisy work moves to evenings and weekends, and the team relocates to the finished part while the rest is being done. For budgeting, we work with three levels: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m², all excluding VAT. A 150 m² office at Luxury level starts at around €300,000. The exact figure comes from the quote, after a site visit and measurements.
Sometimes, in phases and outside opening hours. It depends on noise, dust, which services must be shut off and the municipal procedure. We assess it at the site visit and set it out in the works programme.
Yes, it is the most useful step: checking services, extraction, accessibility and planning use before committing avoids surprises with the activity licence and the fit-out budget.
Yes. Commercial interior design sets the layout, bespoke furniture, lighting and materials around the business and its brand image, and the same team carries out the fit-out.
BCN YARD works with three price levels for office renovation in Barcelona, excluding VAT: Premium from €1,000/m², Luxury from €2,000/m² and Signature from €3,000/m². A 150 m² office at Luxury level starts at around €300,000. The exact figure comes from the quote after a visit to the premises and measurements.
Renovating an office in phases costs more and takes longer than working in empty premises: the crew comes in several times, and temporary partitions and equipment moves are also paid for. If the company can close for the bulk of the works, it is almost always quicker and cheaper. This is decided at the first meeting depending on which areas can stand idle.
Before renovating a rented office, read the lease: the landlord normally has to authorise the works and, when the lease ends, may require the premises to be returned to their original state. That is why a glass partition that will have to come down in five years is planned differently from one that stays for good.
In an office renovation, power and data are not sized for the current headcount, because within a year there are more people. Spare routes are left: trays in the suspended ceiling, floor boxes under desks and reserve circuits back to the consumer unit. The server cabinet needs ventilation, its own circuit and maintenance space, and an authorised installer issues the certificate.
Describe the type of business, how customers and staff will use the commercial space, and which installations need to change. Include the available plans, opening requirements and any need to keep part of the premises operating. Review the technical documentation and activity requirements with the competent technician alongside the renovation project. An itemised scope then makes it easier to compare fit-outs and identify work that is excluded from the estimate.
Share the intended activity, address, floor area, required capacity or workstations and equipment. Include plans and documents for the previous use if available. A restaurant, office and clinic have different requirements.
Define building works and activity procedures separately and coordinate their schedules. Before setting an opening date, identify with the relevant professional what remains to be checked for accessibility, services, escape routes, noise or extraction, according to the intended use. Finishing the works does not itself establish permission to open.
See the children’s psychology centre
BCN YARD / Contact
Service area: Barcelona and the wider province.