Building refurbishment in Barcelona

Building refurbishment covers the shared elements: facade, roof, structure and services. The community of owners commissions it, usually starting from the ITE report.

Building services · work in progress · house with a pool
BCN YARD project · House with a pool

What is building refurbishment and where does it start?

Refurbishing a building in Barcelona means working on its shared elements: facade, balconies, roof, structure, soil stacks and the common electrical installation. The client is the comunidad de propietarios, not an individual owner, and the trigger is usually the ITE report (Inspecció Tècnica de l’Edifici) or a failure that forces the owners’ meeting to act.

The ITE records defects and how serious they are, but it is not a quote. Between “render is coming away from the facade” and the real scope of work there is a separate survey. We explain the inspection itself in our ITE guide; this article covers what happens next.

What does a building refurbishment usually include?

Facade: loose render, cracks, cornices, balcony slabs with rusted reinforcement or corroded steel joists. In older Eixample buildings, balconies and galleries are a common reason for formal notices. Roof: flat azotea, waterproofing, parapets and drainage.

Services: soil stacks and water risers, the common electrical supply, the meter room. If the stacks are fibre cement they may contain asbestos, and only a company registered in RERA may remove them. That is a line of its own in the quote, with its own work plan.

Some communities add accessibility (a lift or ramp) or facade insulation to the same project. Decide early: putting up scaffolding twice costs more than widening the scope once.

In what order does a refurbishment project run?

The order that saves the community money: survey, a project that defines the solutions, the owners’ vote, the licence from the ajuntament (plus a scaffolding and pavement occupation permit where needed), choosing a contractor against one shared scope, the works, and handover.

The most common mistake is to start by collecting quotes. Three firms receive a vague “fix the facade”, each prices its own idea, and the meeting ends up comparing numbers that have nothing in common. With the scope defined in a project, quotes can be compared line by line.

The project is signed by an architect or arquitecto técnico. We work alongside them: they answer for the technical solutions, we make sure those solutions can actually be built in that building, with its stairwell, courtyard and neighbours.

How do the owners approve the works and how does the community pay?

Work on shared elements is approved at the owners’ meeting. The majority required depends on the type of work; in Catalonia horizontal property is governed by the Catalan Civil Code, and your property manager will confirm which threshold applies.

The meeting needs three things: what will be done and why (with photos of the damage), what it costs by section, and how it will be paid. That is usually a derrama, a special levy split according to each flat’s share coefficient. We structure the quote so it can be split into phases: scaffolding and facade, roof, stacks. The community then sees what it pays for at each step, and payments follow the contract and actual progress.

For grants on energy refurbishment, ask the property manager or a gestor: schemes change, and the conditions are worth checking before the vote.

How are the works organised while people live in the building?

Unlike renovating an empty flat, the building is occupied. Scaffolding covers windows and gives access to balconies, so everyone needs a clear schedule: which vertical strip of the facade is being worked on this week, when access to a flat is needed to replace a section of stack, when the water goes off and for how long.

We appoint one site lead who deals with the property manager and the residents. Notices in the stairwell are in Spanish, and we brief Russian-speaking owners in Russian. It sounds minor, but this is where most disputes start: the neighbour had no idea someone was coming on Thursday to cut the stack in their bathroom.

Which mistakes cost the most in a building refurbishment?

Painting the facade without fixing the cause. If the cracks come from rusting balcony joists, they will be back within a couple of winters and the paint budget will already be spent.

Doing the facade without the roof. A leaking azotea soaks the top of the walls, and the new render on the top floor will be the first to suffer.

Picking the lowest price on different scopes. A cheap quote often just leaves out asbestos removal, scaffolding in the inner courtyard or waste disposal.

Not setting aside a contingency. In an old building there is always something behind the render. The reserve and the rules for using it belong in the contract from the start, not in a discussion on the scaffold.

How do you start a building refurbishment with BCN YARD?

Send us the ITE report if you already have one, photos of the problem areas and the property manager’s contact. We reply to enquiries within an hour, visit the building and prepare an initial technical and cost proposal the owners’ meeting can discuss. We run projects in Spanish and Russian.

Frequently asked questions

Does the ITE report work as a refurbishment quote?

The ITE (Inspecció Tècnica de l’Edifici) report describes defects and their severity, but it is not a refurbishment quote. Between 'there is spalling on the facade' and the actual scope of works you need your own survey and a project with defined solutions, signed by an architect or arquitecto técnico. Only then are comparable quotes requested.

Why shouldn't quotes be requested before the refurbishment project?

Requesting quotes before the refurbishment project is the most common mistake: three companies receive a vague 'fix the facade', each prices its own idea, and the owners compare figures that have nothing in common. With the scope defined in a project, quotes are compared line by line, and the cheapest can no longer hide what it leaves out.

How do residents pay for a building refurbishment?

A building refurbishment is approved at the owners' meeting and is normally paid through a special levy (derrama) split according to each flat's share coefficient. The majority required depends on the type of works and is set by the Catalan Civil Code; the building administrator confirms the threshold. A quote split into phases shows what is being paid at each stage.

What mistakes are made when refurbishing a building facade?

The costliest facade refurbishment mistakes are painting without fixing the cause, such as rusted balcony joists, doing the facade without repairing a leaking roof, picking the lowest price across different scopes, and not allowing a contingency item. Putting up scaffolding twice costs more than widening the scope once.

Sources

Royal Decree 396/2006 on work with asbestos exposure risk, arts. 11 and 17

Civil Code of Catalonia, Book Five (Act 5/2006), art. 553-25

Government of Catalonia, Housing: FAQ on the Technical Building Inspection (ITE)

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property