BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

Choosing flooring for your home: beyond the photograph

Flooring is chosen by how each area is used, the substrate underneath, the transitions and the upkeep; the photo comes last.

Living room · work in progress · house with a pool
BCN YARD project · House with a pool

In what order should you choose flooring for a home?

Flooring is chosen by answering four questions in this order: how each area is used, what substrate lies underneath, how it meets other materials and doors, and how much upkeep you are willing to do. Only then do you choose among the options that pass the filter by colour and look. Reverse the order and you end up with a floor that looks great in the photo but cannot take the entrance traffic, does not fit under the doors or is incompatible with underfloor heating.

In a high-end home the usual families are engineered or solid wood, porcelain, natural stone and microcement. Each has its place; almost none suits every room.

How does each area's use affect the flooring you choose?

Describe real use, not ideal use: where beach sand comes in at a Castelldefels house, where the dog eats, which area gets several hours of direct sun from the balcony, whether you cook daily or occasionally, how the home is cleaned. Sand scratches wood and varnish; sun fades some species; water by the sink punishes parquet joints.

Do not trust broad labels such as "durable" or "suitable for kitchens". Ask for the specific product's properties, such as use class, top-layer hardness or slip resistance in bathrooms and terraces, and compare them with what you described.

What should you check about substrate, moisture and underfloor heating?

In an older Eixample flat, underneath there may be original hydraulic mosaic tiles, sometimes worth keeping, or uneven screeds on beam floors that cannot take much added weight. Thick stone on its mortar bed may be too much for an old floor structure; the technician assesses that before choosing.

If a new screed is laid, wood is not installed until the substrate moisture drops to the level the manufacturer requires, and that is measured, not guessed. With underfloor heating, porcelain and stone conduct heat well; wood works if it is engineered, of moderate thickness and declared compatible by the manufacturer. This decision comes before the screed.

What does herringbone demand compared with straight planks?

A herringbone pattern, like the one in the Urgel flat in the Eixample, transforms a room, but it demands more than straight planks: a very flat substrate, more cuts and therefore more spare material, more fitting hours, and prior decisions on where the pattern starts, which direction it runs relative to the light and the main room, and how it finishes at the walls.

These decisions are drawn on a setting-out plan before ordering the material. Otherwise the pattern ends up off-centre relative to the room's axis, or with small slivers at the front door, exactly where they show most. In the quote, compare material and fitting separately: herringbone mainly increases labour cost.

How are doors, skirting and changes of material handled?

Where wood meets porcelain, for example between hallway and bathroom or living room and kitchen, the two finishes have different thicknesses. For them to sit at the same level with no trim or step, the screed in each zone is laid at a different height, and that is decided before laying it. The same applies to terraces if you want visual continuity between inside and outside.

Also check the clearance under doors, especially bespoke or flush ones, the skirting type, which for a skirting flush with the wall is decided before plastering, and the expansion joints wood needs in large rooms. None of this shows much in a photo and all of it shows in daily life.

How do you approve the flooring sample and batch?

A small sample in a showroom tells you little. Ask for a large piece or several planks, place it in the home next to the planned paint, joinery and fabrics, and look at it in the morning and afternoon, in the flat's real light. With naturally variable materials such as wood or stone, ask how that variation looks across a large area.

When ordering, confirm that all the material comes from the same batch, since two batches of the same model can differ in tone, and that a reserve percentage is ordered for cuts and future repairs. Approval of the product and the setting-out is given in writing, with the exact reference.

What upkeep and records does each type of floor need?

Oiled wood can be repaired locally but needs periodic maintenance; varnished wood copes better with daily wear, but a deep scratch means sanding a larger area. Porcelain needs almost nothing; natural stone needs treatment depending on the type. Choose knowing what upkeep you will actually do.

Keep the exact reference, finish, care instructions and a few spare boxes. In the Urgel flat the photo shows the herringbone parquet; what turns a photo into a floor you can still repair in ten years is that documentation. If you are choosing flooring for your renovation, send us the plan and photos; we reply within an hour.

Frequently asked questions

Can you lay parquet over underfloor heating?

Yes, wood works with underfloor heating if it is engineered, of moderate thickness and declared compatible by the manufacturer. Porcelain and stone conduct heat well. The decision on the flooring and the underfloor heating is made before the screed is laid, not afterwards.

When can wood flooring go down on a new screed?

Wood is not laid on a new screed until the substrate moisture drops to the level the flooring manufacturer requires, and that moisture is measured, not guessed. Laying it earlier puts the floor at risk. In older Eixample flats, the technician also assesses whether the floor structure can take the weight of the new floor.

Why does herringbone flooring cost more than straight planks?

Herringbone needs a very flat substrate, more cuts and therefore more spare material, and more fitting hours, so it mainly increases labour cost. Before ordering the material, a setting-out plan is drawn: where the pattern starts, which direction it runs relative to the light and how it finishes at the walls.

Oiled or varnished wood: which suits you?

Oiled wood can be repaired locally but needs periodic maintenance. Varnished wood copes better with daily wear, but a deep scratch means sanding a larger area. Porcelain needs almost nothing, and natural stone needs treatment depending on the type. Choose knowing what upkeep you will actually do.

Why order all the flooring from the same batch?

All the flooring is ordered from one batch because two batches of the same model can differ in tone. A reserve percentage is also ordered for cuts and future repairs, and it is worth keeping a few spare boxes with the exact reference. Approval of the product and the setting-out is given in writing, with that reference.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property