Can you add underfloor heating in a renovation?
Yes, in almost any flat or house, but the floor will rise. A water-based system with insulation and screed adds roughly 6 to 10 cm including the floor finish, low-profile systems about 2 to 3 cm, and an electric mat under tiles a few millimetres on top of the adhesive. The exact figure depends on the system you choose and the manufacturer’s data sheet.
That leads to the main rule: underfloor heating is decided at the design stage, before doors, kitchen and flooring are ordered. If it comes up after demolition, drawings and some orders have to be redone.
Where do the extra centimetres of underfloor heating show up?
A higher floor affects everything that meets it. Internal doors have to be made for the new floor level. The threshold of the balcony door in an Eixample flat ends up lower relative to the floor, which is a leak risk when rain comes in sideways. The junction with a room that is not being renovated turns into a step or a small ramp.
In the kitchen, the extra height comes out of the space under the worktop. Integrated dishwashers and ovens have fixed installation dimensions, and the plinth may no longer work. In a duplex the first or last stair riser changes height. In older buildings with ceilings over three metres, headroom is rarely the issue; in flats from the 1970s and 80s with lower ceilings it needs checking separately.
Can an old building’s floor structure take underfloor heating?
Screed is heavy. Many older Barcelona buildings have floors built on timber or steel joists with infill, and adding load across the whole flat is a question for a structural technician, not something to judge by eye on site. If the margin is tight, there are lighter options: dry systems with thin spreader plates, or a thinner anhydrite self-levelling screed.
Think about the neighbours below as well. The insulation layer under the pipes reduces impact noise, which is an argument for a complete system rather than the thinnest one available.
Water or electric underfloor heating: where does the heat come from?
A water-based floor needs a heat source. It works best with an air-source heat pump, known in Spain as aerotermia: the low water temperature in the circuit is exactly what underfloor heating wants. A condensing gas boiler also works. The heat pump’s outdoor unit goes on a terrace, roof or façade, and that brings in the rules of the comunidad de propietarios and, in protected buildings, façade restrictions.
If the building has central heating, connecting underfloor heating to the shared circuit has to be studied with an engineer and the comunidad: heat metering, hydraulic balancing and the neighbours’ agreement. Sometimes the sensible answer is to drop the water option.
Electric underfloor heating needs less building work and costs less up front, but uses more energy. For a bathroom where it runs in the morning and evening, it makes sense. For a whole home it should be compared with a water system on several years of bills.
With a heat pump, the floor can also cool slightly in summer. Given Barcelona’s humid summers, that requires dew-point control, or condensation will form on the floor. It does not replace air conditioning that dehumidifies.
Which floor finishes are compatible with underfloor heating?
Porcelain tile and stone transfer heat best. Engineered wood works if the manufacturer explicitly approves it for underfloor heating, usually fully bonded to the screed. Solid wood and thick finishes perform worse and react more to swings in humidity and temperature. Vinyl floors have a maximum surface temperature stated in their data sheet.
If you want herringbone parquet like the one in the Urgel flat in the Eixample, the answer is an engineered herringbone approved by the manufacturer, not giving up underfloor heating. Choosing flooring is covered in a separate guide.
In what order is underfloor heating installed, and which mistakes are costly?
First come the circuit layout room by room and the position of the manifold. The manifold goes in an accessible cupboard or recess, because you will need to get to it again. Pipes are not laid under kitchen units, fitted wardrobes or the bath, where the heat would simply be wasted.
Before the screed is poured, the pipes are pressure-tested and the layout is photographed with reference to the walls. Five years later, those photos will save you from drilling through a pipe. The first start-up is gradual, following the screed manufacturer’s protocol, not full power on handover day. And fit a thermostat in every room: a bedroom and a living room do not need the same temperature.
What does underfloor heating cost, and what should you send for an assessment?
We do not price underfloor heating in isolation from the project, because the cost depends on the area, the system, the heat source and what happens to the floor anyway. In a full renovation it is part of the quote within our tiers, from €1,000/m² at Premium level excluding VAT, and the exact scope is set after a site visit and measurements.
Send us the floor plan, the heating you have now and the floor finish you would like. We reply within an hour and will tell you which questions need answering before the design starts.
Frequently asked questions
How much does underfloor heating raise the floor?
As a guide, water underfloor heating with insulation and screed adds 6 to 10 cm including the floor finish; low-profile systems about 2 to 3 cm; and an electric mat under ceramic tiles a few millimetres plus the adhesive. The exact figure comes from the chosen system and the manufacturer’s data sheet.
Can parquet go over underfloor heating?
Yes, with engineered wood: multi-layer boards work over underfloor heating if the manufacturer expressly approves them, usually fully bonded. Solid wood and thick floorings perform worse and react more to changes in humidity and temperature. For herringbone, the answer is engineered herringbone approved by the manufacturer. Porcelain and stone transmit heat best.
Which is better, electric or water underfloor heating?
Electric underfloor heating needs less building work and costs less upfront, but uses more energy; in a bathroom used morning and evening it is a sensible choice. Water underfloor heating needs a heat source and works best with an air-source heat pump or a condensing boiler. For a whole home, compare the two on several years of bills.
Can you install underfloor heating in a flat with central heating?
In a flat with central heating, connecting underfloor heating to the shared circuit is assessed with an engineer and the comunidad de propietarios: metering, hydraulic balancing and the neighbours’ agreement. Sometimes the sensible answer is to rule out a water system. Electric underfloor heating can then be an alternative, with different running costs worth comparing.
Can underfloor heating cool in summer?
Yes: with a heat pump, the same underfloor system can also cool the home in summer. With Barcelona’s humidity this requires dew-point control; otherwise condensation forms on the floor surface. Floor cooling is not a replacement for air conditioning, which also dehumidifies the air.
Sources
Regulation on Thermal Installations in Buildings (RITE), IT 2.2.2 leak tests