How do 1950s-70s buildings differ from modernista ones?
They were built on a concrete or mixed frame, with lower ceilings, fewer thick walls, a lift and a garage, rather than load-bearing brick walls with Catalan vaults. For renovation that means more freedom in layout and more engineering questions.
Ceilings are usually 2.5–2.8 m against 3.3–3.6 m in the Eixample. This matters for climate systems: ducted air conditioning in a dropped ceiling eats 20–30 cm, so you choose between height and invisible ducts. Windows are larger and plainer, with no galleries or mosaics, but there are big terraces and loggias, especially in Galvany and the upper part of Sant Gervasi.
Finishes of the era are modest: terrazzo, plain timber floors, metal windows that are often worth replacing outright. Room partitions are sometimes hollow brick of 7–10 cm. Sound insulation from neighbours is weaker than in massive old houses, and needs checking.
The district itself is quiet and green, so some flats have terraces looking onto gardens. That is the main value of these buildings.
What problems are typical of this period?
Typical are old wiring without earthing, galvanised or cast-iron pipes, weak thermal and acoustic insulation, metal windows with cold bridges, damp on roofs and terraces, and asbestos in some services. This is the usual set for buildings of the period and is solved in a full renovation.
Wiring is normally replaced entirely and a new board with earthing fitted. Water and drainage are also renewed up to the risers, agreed with the community. Facades and roofs usually need repair, and common works go through the owners' meeting.
Top-floor flats suffer leaks through terraces: waterproofing is renewed, and when pipes and tile are laid over the slab, accidental damage is avoided. Terrace waterproofing with neighbours below is covered in our penthouse article.
Energy performance is low: uninsulated walls, single or thin glazing. In a luxury renovation windows are replaced with modern, well-insulated ones, and walls are insulated from inside where it does not eat too much area.
Can you remove load-bearing walls?
In frame buildings partitions can mostly be removed, but each wall is first checked by a structural engineer: some carry load or stiffen the building. The decision comes from design and calculation, not from the look of the masonry.
In 1950s–70s buildings walls come in three kinds: light hollow-brick partitions, brick walls that carry load and concrete frame elements. The first come out without trouble, the second are replaced by steel beams or frames, the third are left alone. You cannot tell the type without opening up: you need the building plans, trial openings and calculations.
If a wall is load-bearing, its removal is agreed: an engineer's design, a licence and sometimes the community's consent, because the work touches the building's structure. Beams and steel reinforcement are planned ahead, with reserve height in the ceiling.
An open plan is more feasible in Sant Gervasi than in the Eixample because the structure is simpler. But a design is mandatory: without it you risk both safety and liability.
What about asbestos in these buildings?
Asbestos has been banned in Spain since 2002, and the buildings of the 1950s–70s were built when it was widely used: in fibre-cement pipes, tanks, roof sheets, tiles and insulation. Material in good condition can stay, but in a renovation it must not be opened without specialists.
The national occupational safety institute, INSST, confirms that asbestos materials installed before the ban may remain in place while in good condition and not releasing fibres. But if the works touch such material, sanding, drilling and removal release fibres, and only an accredited firm does it, under a specific plan.
That is why samples of suspect materials are taken before the design: pipes, sheets, tile adhesive layers. The laboratory result decides whether a removal plan is needed and how the estimate is built. The detailed procedure is in our article on asbestos removal.
Allow time and budget for this item from the start. Hidden asbestos found mid-job stops the site and costs more than a check beforehand.
How do you extend a terrace legally?
Extending a terrace always depends on whose it is in the documents and what the planning rules allow. Closing a terrace with glass, building on it or taking over part of the common space without a licence and the community's consent is not permitted.
The order: check whether the terrace is private property or a common element with a right of use; check permitted building in the planning conditions certificate; a design and a licence; a vote of the owners if the facade changes or common elements are affected. Light glazing with sliding panes, as in our penthouse article, is acceptable in many buildings, but a rigid closed volume needs a licence and counts against the built-area ratio.
Often the most realistic path is not to extend the volume but to improve how the terrace is used. New floor, pergola, green walls, built-in kitchen, lighting, balustrade. That does not change the building but turns the terrace into a room.
These questions should be checked before purchase, not after. An unlawful structure can bring a fine and an order to demolish.
How BCN YARD renovates in Sant Gervasi-Galvany
We start with a visit and measurements: we check walls, services, possible asbestos and the state of the terrace, then prepare a staged estimate. Our own crew, trusted subcontractors and one person responsible for the site, in Russian and Spanish.
Payment by contract and in stages. A guide for a high-end renovation: Luxury from 3,000 €/m² before VAT, with the exact price in the estimate. We usually answer an enquiry within an hour.
Frequently asked questions
Can you raise the ceilings in a 1960s flat?
Normally not: height is fixed by the floor structure, and you only gain by removing a dropped ceiling or changing the technical scheme. You cannot add height above the slab. What you can do is remove unnecessary layers, hide ducts in corridors and use compact climate systems.
How can you tell if there is asbestos in a wall?
You cannot tell by looking: a sample must be analysed in a laboratory. Suspect materials are fibre-cement pipes, roof sheets and boards, old tiles and adhesive layers. A specialist takes the sample so fibres are not released. The renovation starts after the result.
Do you need a licence to change windows in Sant Gervasi?
Replacing windows in a way that changes the facade's look requires the community's agreement and sometimes a notification or licence from the Ajuntament. If the new ones repeat the colour, profile and pattern of the existing ones, the process is simpler. Always check the statutes and the building protection certificate.
Sources
Royal Decree 396/2006 on work with asbestos exposure risk, arts. 11 and 17