Living at home during renovation: how to decide

In a full renovation it is not realistic; in a partial one it can be, if there is a bathroom, water, power and a dust-sealed zone.

Urgel living room and windows
Project photograph: Urgel · BCN YARD

Can you live at home during a renovation?

In a full renovation, no: for weeks there will be no water, no stable power and no usable bathroom, and demolition dust gets everywhere. In a partial renovation, such as a kitchen, a bathroom when there is a second one, or floors and painting zone by zone, it is possible if specific conditions are met and agreed in writing before work starts.

The decision should not be based only on saving temporary rent. Staying usually lengthens the works and repeats protection tasks, so the real saving is smaller than it looks. Below we explain how to work it out and what to ask for if you decide to stay.

Five minimum conditions for staying

First: a bathroom that works all the time, or a clear plan for the days it does not. Second: water and power in the lived-in area, with cuts announced in advance. Third: a way to cook, even a temporary one. Fourth: real dust separation, with zipped plastic enclosures, sealed joints and a site route that does not cross the living area. Fifth: a quiet space to sleep and, if anyone works from home, to work.

If any of these fails for more than a few days, living there becomes exhausting. With small children, elderly people, allergies or pets the bar rises: fine dust from sanding plaster and the smell of varnishes and paints affect people more than expected.

Which stages of work are the hardest

Not every week on site is the same. Demolition is the noisiest and generates the most dust. Services work means water and power cuts. Screeds put whole areas off-limits for days. Sanding plaster and parquet produces the finest dust, the kind that gets through any gap. Varnishes and paints leave smells that need good ventilation.

If you want to stay only part of the time, these are the stages to be away for. A works schedule with the stages marked lets you plan a few weeks away instead of months.

Phasing has a cost

Renovating zone by zone so you can keep living there means putting protection up and down several times, moving furniture from room to room, stopping and restarting trades and stretching the job by weeks. A finished room may end up as a route for materials if logistics are not well planned.

So before deciding, ask for two options to be compared: continuous work with the home empty, and phased work with you inside. The comparison covers duration, works cost and disruption. Then add temporary rent and furniture storage to the first option. The difference is often smaller than expected, and continuous work finishes sooner.

Two examples

In a full renovation like the Urgel flat in the Eixample, 109.80 m² with four bedrooms, two bathrooms and an open kitchen, layout and services change throughout the home: there is no zone that can stay habitable for most of the works. There the question is not whether to stay, but when to book temporary accommodation and with what margin.

A different case is a house in Castelldefels where only the kitchen is being redone and another floor has a full, self-contained bathroom. With a temporary kitchen in another room and the works closed off behind a door, the family can stay at home with reasonable inconvenience.

If you stay: what to put in writing

Before work starts, agree in writing which zones are for work and which for living, working hours compatible with the comunidad de propietarios rules, how and how far in advance water and power cuts are announced, who holds keys, how the site is cleaned at the end of each day and where materials and tools are stored.

If the conditions stop being met, for example because a problem forces the water off for several days, the plan is reviewed, and the best option may be to leave for a few weeks. It is worth having that plan B ready from the start. If the bathroom being renovated is the only one in the home, we cover that in a dedicated article.

How we approach it

On the first visit we ask who lives in the home, whether anyone works from there and whether there are fixed dates. From that we tell you frankly whether staying is feasible and during which stages it is better to be away. A single site manager, who speaks Russian and Spanish, warns you of every cut in advance. Send us the scope of your renovation; we reply within an hour.

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

Enquiry delivery is not connected yet. You can complete and download a summary; it will not be sent to the company.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property