BCNYARD■
+34 631 09 68 62WhatsAppTelegram
ESENRU

Blog

Eixample Esquerra vs Dreta: how renovating differs on each side

The difference between Esquerra and Dreta runs through the building, not the side: protection, finishes, floors, noise and floor level. What to compare, where to find the protection entry and how to choose a flat for a luxury renovation.

Terrace · completed work · house on the Garraf coast
BCN YARD project · House on the Garraf coast

How does renovating a flat in the Eixample Esquerra differ from the Dreta?

The main difference is the building, not the side. The Dreta more often has showpiece modernista architecture with original finishes to restore and get approved; the Esquerra has more plain buildings, where the renovation is closer to re-planning and new services. Which case is yours is shown by the building's catalogue entry.

The Eixample was built under the Cerdà plan in the late 19th and early 20th century. By convention the district is split into a right half (Dreta) and a left half (Esquerra), and officially it consists of six neighbourhoods: Dreta, Antiga Esquerra, Nova Esquerra, Sant Antoni, Fort Pienc and Sagrada Família. Check on the map which one your address belongs to. We have a separate guide on the Dreta; here we compare the sides.

How do buildings differ between the left and right sides of the Eixample?

The Dreta was built as the district of the bourgeoisie and of modernisme, the Esquerra as a residential district, denser and more restrained. This is the city council's own description: the Dreta was the first sector of the Cerdà project and the central part of the district, the bourgeois neighbourhood where modernisme developed; the Antiga Esquerra was urbanised earlier than the rest of that side and was already well populated by the end of the 19th century; the Nova Esquerra was historically one neighbourhood with it and was split because of its size and density.

What that means for a renovation, in practice. In the Dreta you more often meet buildings with original plasterwork, hydraulic mosaic floors, timber joinery and high ceilings, and a large part of the budget goes on preserving them. In the Esquerra there are more buildings with simpler finishes, where services, floors, noise and layout come first, and historic features are less frequent. That is a tendency, not a rule: the Esquerra also has first-rate modernista houses, and the Dreta has flats rebuilt beyond recognition.

Where are there more protected buildings: Esquerra or Dreta?

I do not give counts by side: the comparison has to be made in the register, and the register is kept by building. It is to be expected that higher protection levels cluster where modernisme is concentrated, that is around the Dreta, but it is confirmed only by address.

Protection in Barcelona has four levels. Level A: Bé Cultural d'Interès Nacional, decided by the Generalitat. Level B: Bé Cultural d'Interès Local, decided by the Ajuntament and ratified by the Generalitat. Level C: Bé d'Interès Urbanístic, the Ajuntament's own competence. Level D: Bé d'Interès Documental. For A, B and C upkeep is mandatory and demolition is not possible; for D demolition is allowed after an approved historical-architectural study.

The entry describes the protected element and the permitted interventions; you find it by address on the Ajuntament's urban planning information portal. For a renovation it means you know before the design, not after, what you cannot touch in your building (facade, staircase, balconies, courtyard) and which works are admissible.

What typical problems do buildings from 1890 to 1930 have?

Floors, risers, damp, noise and traces of earlier alterations. Buildings of those years last a long time, but their weak points are common.

Floors. Timber beams or steel joists with a ceramic vault (revoltón) carry less than modern reinforced concrete, timber suffers from damp, fungus and termites, and deflection shows in the floor; the load is calculated by the architect. Load-bearing walls. Brick bearing walls cannot be cut like partitions; enlarging an opening is designed and reinforced with beams. Risers. Water and drainage are shared, cast iron or old, and replaced through the community.

Balconies. Balcony slabs, often with metal joists, deteriorate over time, and they are a common element of the building. Facade. Old single-glazed windows let noise and cold through. Traces of alterations. In the 1960s to 80s ceilings were covered with false ceilings that hide mouldings and damage; they have to be opened before the quote. The layout with a long corridor and a light well is covered in our guide to typical Eixample flat layouts.

How do you choose the floor and side for a luxury renovation?

Choose by street and by floor, not by side. What decides it is ceiling height, noise, light, the lift, the neighbours and the building's protection, and all of that is checked on the specific flat.

Floor. The principal (first or second floor above the mezzanine) gives high ceilings and a grand layout, but more street noise and less light; we have a separate guide on it. Middle floors balance light and quiet. The top floor gives air and sometimes a terrace, but calls for a check of the roof and waterproofing. Corner. Flats on the chamfered corner of a block get two orientations. Street.

The district's main axes are noisier and the side streets quieter, and that holds on both sides. Courtyard. Windows onto the inner block courtyard are quieter but darker. What to check before deciding: ceiling height under the lowest beam, the building's technical inspection report, the size of the lift and whether there is a concierge, the state of the risers and the community's running costs.

How does this change the budget and the schedule?

In the Dreta more money and time go on restoration and approvals, in the Esquerra more often on services and layout; but the condition of the specific flat decides, not the side.

Restoration: lifting and cataloguing hydraulic tiles, restoring mouldings, overhauling the original joinery and balcony doors (there is more detail in the guide on original doors and windows). Services: new electrics and water, climate control with ventilation, sound insulation and levelling of floors.

Protection adds approvals and limits facade materials, and common elements need a community decision. That is why a first quote without a visit and without opening up remains an estimate. In practice what matters is less the side of the district than what turns up once the false ceilings and old coverings come off: that is what changes both the budget and the schedule.

How does BCN YARD work here?

We start with a site survey and measurements: we check floors, risers, damp and ceilings, and look up the building's catalogue entry and the community's documents. Then the quote. An in-house crew works with vetted subcontractors, the project has one person responsible, and payment is by stages under contract. We run projects in Russian and Spanish and reply to an enquiry within an hour.

Reference levels: Premium from 1,000 €/m², Luxury from 2,000 €/m², Signature from 3,000 €/m² excluding VAT; on secondary-housing renovations the VAT in our quotes is usually 21%. The 21% applies because in our renovations materials usually exceed 40% of the taxable base; when they do not, renovating a private individual's home is taxed at 10% (Law 37/1992, art.

91). An example from the Eixample: a flat on Carrer d'Urgell, 109.80 m², with four bedrooms, two bathrooms, an open kitchen, herringbone parquet, slatted wood panelling and a marble wall. The exact price comes in the quote after the survey and measurements.

Frequently asked questions

How do buildings differ between the left and right parts of the Eixample?

According to the Ajuntament, the Dreta was the first sector of the Cerdà project and the bourgeois neighbourhood where modernisme developed. The Antiga Esquerra was urbanised earlier than the rest of that side, and the Nova Esquerra is denser and plainer. In practice the Dreta has more original finishes and the Esquerra more simple buildings, but there are many exceptions, so you look at the specific building.

Where are there more protected buildings: Esquerra or Dreta?

I have not counted by side. It is to be expected that higher protection levels cluster around the Dreta, where modernisme is concentrated, but it can only be checked reliably by address. The Ajuntament's catalogue has four levels, A to D, and the building's entry shows what is protected and which works are admissible.

What are the typical problems of buildings from 1890 to 1930?

Floors of timber or steel beams with a ceramic vault, which carry less than reinforced concrete and suffer from damp and termites; brick load-bearing walls; old shared risers; worn balcony slabs; single glazing; ceilings hidden behind false ceilings from the 1960s to 80s. Some of this shows only once things are opened up, which is why a first quote remains an estimate.

How do I choose a floor for a luxury renovation in the Eixample?

The principal gives high ceilings and a grand layout, but more noise and less light. Middle floors balance light and quiet, the top floor gives air and sometimes a terrace but needs a roof check. A corner flat gets two orientations. Before deciding, measure the ceiling and check the building's technical inspection report, the lift and the risers.

Sources

ajuntament.barcelona.cat

ajuntament.barcelona.cat

BCN YARD / Contact

Tell us what you have in mind.

Service area: Barcelona and the wider province.

  • Own crew and trusted subcontractors
  • We speak Russian and Spanish
  • Reply within an hour
  • Staged payments under contract
  1. 01Property
  2. 02Services
  3. 03Size and location
  4. 04Timing
  5. 05Contact
Property